Skip to main content

Specialized Technical Services for Electrical Systems & Control Cabinets

We provide expert solutions for electrical systems, field instruments, and control cabinet enclosures, covering everything from system monitoring to on-site technical repairs. BIMservice™- Ensure safety, reliability, and long-term efficiency with our specialized services.

coolenvi-BIMservice-consulting-female-recommendation.png?ts=1764251300
Filter
Tip
 BIMaudit | VDI Hygiene Inspector
BIMaudit | VDI Hygiene Inspector
Task - Work Location: DK - From Ribe
The Hygiene inspector for sampling and the hygiene assurance for building services systems and food processing surfaces. Hygiene assurance for building services systems and food processing surfaces Our hygiene inspectors offer comprehensive sampling and hygiene assurance for building services systems and food processing surfaces. Here is an overview of the essentials: Advantages: Our inspectors have theoretical and practical experience in plant engineering and are familiar with VDI regulations and ASHRAE guidelines. Their extensive practical experience brings with it outstanding expertise. Sampling and risk assessment: Our inspectors conduct surface sampling using contact or swab samples. The informative laboratory analysis provides information about microbiological or chemical parameters and serves as a risk assessment for operators. Documentation and recurring inspections: The inspectors determine sampling points and document them on inventory plans. They also prepare recommendations for action and risk assessments for operators through regularly recurring sampling. Visual inspection and testing of external work environments: A comprehensive visual inspection and the testing of external workplace environments round out the range of services offered by our inspectors. With our experienced hygiene inspectors, you can ensure hygiene safety and health in your company. Are maintenance contracts necessary? We offer this without restrictive contracts in the BIMcare™ category. Always fully configure supply chains This ideally only applies to a 4-day week from Monday to Thursday. This is not an all-inclusive package. Travel costs and work materials are not included and can be found at BIMdepot™, BIMcare™, BIMpilot™, or BIMphases™

€145.00*
 BIMservice | E&IC Control Technician
BIMservice | E&IC Control Technician
Task - E&IC : IC | Replace Motor protection control | Task - Work Location: Remote
The Electric, Instrumentation, Controls Automation Technician is the solution for the well-regulated operation of building technologies. The economically effective. How our climate-neutral E&IC Technician works First, a comprehensive analysis of the potential causes of failure and the components involved would be required to identify possible vulnerabilities. Based on this, updates or upgrades to valves, pumps, and other relevant equipment could be considered to ensure more reliable performance. Integrating more advanced technology, perhaps incorporating IoT devices for remote monitoring and control, could also improve the effectiveness of the system. In this way, we minimize maintenance and repair times and increase operational efficiency. Additionally, we incorporate environmentally friendly practices to make operations more carbon neutral and realize long-term cost savings. Always fully configure supply chains This is ideally just for a 4-day week from Monday to Thursday. This is not an all-inclusive package, travel costs and work materials are not included and can be found under BIMdepot™, BIMcare™, BIMpilot™, or BIMphase™. BIMcare™ customers automatically receive a discount on this item.

€145.00*
 BIMservice | Electrical Technician
BIMservice | Electrical Technician
Task - E&IC : E | Measure Camera View | Task - Work Location: DK - From Ribe
The Electrical Engineer for Low-Voltage AC/DC Systems is responsible for the safe, compliant, and efficient installation, commissioning, and verification of smaller electrical systems up to 1000 V DC. This includes photovoltaic systems, DC strings, protection devices, energy storage systems, and all associated control and network infrastructures. How does the climate-neutral Electrical Engineering Service work? First, a detailed assessment of all DC and AC components is performed to identify potential failure points and safety-relevant weaknesses. This includes examining PV strings, DC fuses, combiner boxes, cabling, grounding systems, inverters, and energy storage units. Based on this analysis, targeted upgrades, reconfiguration, or replacement of components may be implemented to improve operational reliability and ensure compliance with electrical safety standards up to 1000 V DC. Furthermore, modern monitoring technologies, including Victron control systems and IoT-based supervision, can be integrated to enable remote diagnostics and performance optimization. In this way, maintenance times are reduced, system uptime is increased, and long-term operational efficiency is achieved. Environmentally friendly and energy-efficient approaches are consistently applied to support carbon-neutral operations. What is obligation to fully configure supply chains? This is ideally just for a 4-day week from Monday to Thursday. This is not an all-inclusive package, travel costs and work materials are not included and can be found under BIMdepot™, BIMcare™, BIMpilot™, or BIMphase™. BIMcare™ customers automatically receive a discount on this item.

€145.00*
Tip
BIMservice | Fault Diagnose Control Technology
BIMservice | Fault Diagnose Control Technology
Task - E&IC : IC | Analyze cause of fault | Task - Work Location: Remote
Unknown fault in the control cabinet? We will create a diagnosis within 3 hours to solve the problem. The advantage of a maintenance contract After maintenance has been carried out as part of "BIM-Care", we will reimburse 50% of the costs of a fault diagnosis, provided that the resulting repair offers are commissioned and BIM-Care is then continued for at least 12 months without interruption. Always configure supply chains completely It is best to work 4 days a week from Monday to Thursday. This is not an all-inclusive service, travel costs and work equipment are not included and these can be found under BIMpilot or BIMservice.

Content: 3 Hour/s (€145.00* / 1 Hour/s)

€435.00*
Tip
BIMservice | Technical Advice
BIMservice | Technical Advice
Task - Work Location: Remote
Measurement, optimization or consulting? We offer this service on-site or remotely for one hour, tailored to your specific needs. What are the advantages of a BIMcare™ maintenance contract? After maintenance is performed under BIMcare™, we will reimburse 50% of the cost of a fault diagnosis, provided that the resulting repair quotes are commissioned and BIMcare™ is subsequently continued continuously for at least 12 months. Even without BIMcare™, a cost-effective remote service is available via WhatsApp. Always configure supply chains completely This is ideally suited for a 4-day work week, Monday through Thursday. This is not an all-inclusive package; travel expenses and materials are not included and can be found at BIMdepot™, BIMcare™, BIMpilot™, or BIMphase™. BIMcare™ customers automatically receive a discount on this item.

€145.00*
Tip
Coolenvi™ Electro Installation – 10 m Power Line – 1AT | 16h | 30 km
Coolenvi™ Electro Installation – 10 m Power Line – 1AT | 16h | 30 km
Item - Connection Length: 10m | Task - Work Location: DK - From Ribe
The Coolenvi™ Electro Installation package offers professional installation of a 10 m power line including SPD, protection and connection. Delivery, installation, connection and commissioning completed in one working day from the Service Hub. Scope of Services Working time: 16 hours total team effort (2 technicians × 8 hours) Travel: up to 30 km included Material delivery: power line and protection components delivered curbside Electromontage: routing and connection of the power line into the existing electrical distribution Protection: installation of FI/LS and SPD devices System check: electrical testing and functional inspection Commissioning: handover in fully operational condition This installation package provides a clear, professional solution for your electrical power line and protection, delivered by certified technicians. NOTE: Fixed-price packages may include delivery and/or installation by service technicians using special tools and specialized vehicles, as well as customer-specific assembled and pre-picked materials and service infrastructure. Personnel, materials, and resources are reserved exclusively. Cancellation after booking is not possible (§ 312g Abs. 2 BGB / EU Consumer Rights Directive 2011/83/EU). The installation date is scheduled once after booking and is only available within the specified season. This also applies if performance cannot be carried out for reasons attributable to the customer, including lack of cooperation or unavailability at the scheduled time.

€1,951.00*
Tip
Coolenvi™ Electro Installation – 15 m Power Line – 1AT | 18h | 30 km
Coolenvi™ Electro Installation – 15 m Power Line – 1AT | 18h | 30 km
Item - Connection Length: 15m | Task - Work Location: DK - From Ribe
The Coolenvi™ Electro Installation package offers professional installation of a 15 m power line including SPD, protection and connection. Delivery, installation, connection and commissioning completed in one working day from the Service Hub. Scope of Services Working time: 18 hours total team effort (2 technicians × 9 hours) Travel: up to 30 km included Material delivery: power line and protection components delivered curbside Electromontage: routing and connection of the power line into the existing electrical distribution Protection: installation of FI/LS and SPD devices System check: electrical testing and functional inspection Commissioning: handover in fully operational condition This installation package provides a clear, professional solution for your electrical power line and protection, delivered by certified technicians. NOTE: Fixed-price packages may include delivery and/or installation by service technicians using special tools and specialized vehicles, as well as customer-specific assembled and pre-picked materials and service infrastructure. Personnel, materials, and resources are reserved exclusively. Cancellation after booking is not possible (§ 312g Abs. 2 BGB / EU Consumer Rights Directive 2011/83/EU). The installation date is scheduled once after booking and is only available within the specified season. This also applies if performance cannot be carried out for reasons attributable to the customer, including lack of cooperation or unavailability at the scheduled time.

€2,181.00*
Tip
Coolenvi™ Electro Installation – 20 m Power Line – 2AT | 22h | 60 km
Coolenvi™ Electro Installation – 20 m Power Line – 2AT | 22h | 60 km
Item - Connection Length: 20m | Task - Work Location: DK - From Ribe
The Coolenvi™ Electro Installation package offers professional installation of a 20 m power line including SPD, protection and connection. Delivery, installation, connection and commissioning completed in one working day from the Service Hub. Scope of Services Working time: 22 hours total team effort (2 technicians × 11 hours) Travel: up to 2x 30 km included Material delivery: power line and protection components delivered curbside Electromontage: routing and connection of the power line into the existing electrical distribution Protection: installation of FI/LS and SPD devices System check: electrical testing and functional inspection Commissioning: handover in fully operational condition This installation package provides a clear, professional solution for your electrical power line and protection, delivered by certified technicians. NOTE: Fixed-price packages may include delivery and/or installation by service technicians using special tools and specialized vehicles, as well as customer-specific assembled and pre-picked materials and service infrastructure. Personnel, materials, and resources are reserved exclusively. Cancellation after booking is not possible (§ 312g Abs. 2 BGB / EU Consumer Rights Directive 2011/83/EU). The installation date is scheduled once after booking and is only available within the specified season. This also applies if performance cannot be carried out for reasons attributable to the customer, including lack of cooperation or unavailability at the scheduled time.

€2,752.00*
Tip
Coolenvi™ Electro Installation – 30 m Power Line – 2AT | 26h | 60 km
Coolenvi™ Electro Installation – 30 m Power Line – 2AT | 26h | 60 km
Item - Connection Length: 30m | Task - Work Location: DK - From Ribe
The Coolenvi™ Electro Installation package offers professional installation of a 30 m power line, including SPD, protection and connection. Delivery, installation, connection and commissioning completed in one working day from the Service Hub. Scope of Services Working time: 26 hours total team effort (2 technicians × 13 hours) Travel: up to 2x 30 km included Material delivery: power line and protection components delivered curbside Electromontage: routing and connection of the power line into the existing electrical distribution Protection: installation of FI/LS and SPD devices System check: electrical testing and functional inspection Commissioning: handover in fully operational condition This installation package provides a clear, professional solution for your electrical power line and protection, delivered by certified technicians. NOTE: Fixed-price packages may include delivery and/or installation by service technicians using special tools and specialized vehicles, as well as customer-specific assembled and pre-picked materials and service infrastructure. Personnel, materials, and resources are reserved exclusively. Cancellation after booking is not possible (§ 312g Abs. 2 BGB / EU Consumer Rights Directive 2011/83/EU). The installation date is scheduled once after booking and is only available within the specified season. This also applies if performance cannot be carried out for reasons attributable to the customer, including lack of cooperation or unavailability at the scheduled time.

€3,212.00*
Tip
Coolenvi™ Electro Installation – 5 m Power Line – 1AT | 12h | 30 km
Coolenvi™ Electro Installation – 5 m Power Line – 1AT | 12h | 30 km
Item - Connection Length: 5m | Task - Work Location: DK - From Ribe
The Coolenvi™ Electro Installation package offers professional installation of a 5 m power line including SPD, protection and connection. Delivery, installation, connection and commissioning completed in one working day from the Service Hub. Scope of Services Working time: 12 hours total team effort (2 technicians × 6 hours) Travel: up to 30 km included Material delivery: power line and protection components delivered curbside Electromontage: routing and connection of the power line into the existing electrical distribution Protection: installation of FI/LS and SPD devices System check: electrical testing and functional inspection Commissioning: handover in fully operational condition This installation package provides a clear, professional solution for your electrical power line and protection, delivered by certified technicians. NOTE: Fixed-price packages may include delivery and/or installation by service technicians using special tools and specialized vehicles, as well as customer-specific assembled and pre-picked materials and service infrastructure. Personnel, materials, and resources are reserved exclusively. Cancellation after booking is not possible (§ 312g Abs. 2 BGB / EU Consumer Rights Directive 2011/83/EU). The installation date is scheduled once after booking and is only available within the specified season. This also applies if performance cannot be carried out for reasons attributable to the customer, including lack of cooperation or unavailability at the scheduled time.

€1,491.00*
Tip
Coolenvi™ Electro Installation – 50 m Power Line – 2AT | 32h | 60 km
Coolenvi™ Electro Installation – 50 m Power Line – 2AT | 32h | 60 km
Item - Connection Length: 50m | Task - Work Location: DK - From Ribe
The Coolenvi™ Electro Installation package offers professional installation of a 50 m power line, including SPD, protection and connection. Delivery, installation, connection and commissioning completed in one working day from the Service Hub. Scope of Services Working time: 32 hours total team effort (2 technicians × 16 hours) Travel: up to 2x 30 km included Material delivery: power line and protection components delivered curbside Electromontage: routing and connection of the power line into the existing electrical distribution Protection: installation of FI/LS and SPD devices System check: electrical testing and functional inspection Commissioning: handover in fully operational condition This installation package provides a clear, professional solution for your electrical power line and protection, delivered by certified technicians. NOTE: Fixed-price packages may include delivery and/or installation by service technicians using special tools and specialized vehicles, as well as customer-specific assembled and pre-picked materials and service infrastructure. Personnel, materials, and resources are reserved exclusively. Cancellation after booking is not possible (§ 312g Abs. 2 BGB / EU Consumer Rights Directive 2011/83/EU). The installation date is scheduled once after booking and is only available within the specified season. This also applies if performance cannot be carried out for reasons attributable to the customer, including lack of cooperation or unavailability at the scheduled time.

€3,902.00*
Tip
New
Coolenvi™ MICROGRID XS Installation – 11 AT | 176 h | 300 km
Coolenvi™ MICROGRID XS Installation – 11 AT | 176 h | 300 km
Task - Work Location: DK - From Ribe
This installation package provides a structured and professional implementation of your Microgrid XS System, including photovoltaic generation, battery storage, and power conversion. The system is delivered as a partially pre-assembled energy infrastructure unit, enabling reduced on-site installation time, improved system consistency, and repeatable deployment across projects. All works are carried out by certified personnel in accordance with applicable technical standards. Installation Requirements Client Responsibilities The client is responsible for ensuring that all areas required for the installation of the microgrid system are fully accessible and suitable for installation works. Any delays, additional costs, or technical adjustments resulting from unmet site requirements or insufficient client-side preparation shall not be the responsibility of the contractor and may be subject to additional charges. Provision of clear and adequate access to all installation areas (roof surfaces, technical areas, and external spaces) Provision of basic site infrastructure, including electrical power supply, water, and sanitary facilities (toilet) for installation personnel Verification and confirmation of the structural integrity and load-bearing capacity of all installation surfaces, in particular roof structures for photovoltaic systems and ground surfaces for system components, containers, and mounting structures Ensuring sufficient load-bearing capacity and stability for scaffolding, lifting equipment, and other installation aids Our Scope of Installation Installation of 9 photovoltaic modules (approx. 2.1 m × 1.0 m each) Installation of pre-assembled Microgrid XS Power Conversion Unit (PCU), including inverter, MPPT charge controller, protection devices, busbar system, and internal wiring Installation and connection of LiFePO₄ battery system including DC busbar integration DC cabling, string combiner integration, and system wiring AC integration into existing electrical distribution (standard low-voltage connection, excluding modifications to main distribution board) Installation and integration of 2-way smart meter (subject to local grid operator approval and regulatory requirements) Scope of Services Mechanical Installation: Roof mounting system, module installation, alignment, and structural fixing Electrical Installation (DC & AC): Stringing, cabling, combiner integration, PCU connection, and protection devices Energy System Integration: Inverter configuration, battery integration, and MPPT setup Monitoring & Control: Smart meter integration and basic system monitoring configuration Commissioning: Testing, parameterization, and documented handover in operational condition Execution Model: Installation is performed within a defined execution window. Continuous on-site presence is not guaranteed and depends on project phase and workflow optimization Installation Cost Breakdown Position Description Price (€) 1. Mechanical Installation 6 days (2 technicians) – Roof mounting system, PV module installation, structural fixing and alignment 5,440 € 2. Electrical Installation (DC & AC) 3 days (2 technicians) – Internal system wiring, PCU integration, protection and grid connection 2,720 € 3. Energy System Commissioning 2 days (2 technicians) – Inverter setup, battery integration, MPPT configuration, smart meter, internal data network, monitoring setup 1,813 € 4. Logistics & Travel Mobilization, travel costs (up to 300 km), accommodation, tools and consumables 1,470 € 5. Site Equipment PPE provision; scaffolding included in system calculation 250 € Total Installation Cost: 11,693 € The above pricing is based on an estimated total installation effort of approximately 170–190 man-hours, calculated on the basis of a two-person installation team (8-hour workdays). Additional Services (Not Included) Modifications to existing electrical infrastructure (e.g. main distribution board, earthing upgrades) Grid connection approval processes or utility coordination Additional travel or extended mobilization beyond defined scope Delays or additional work due to missing site readiness or access restrictions Special construction works (core drilling, structural modifications, piping adjustments) Integration into external systems (WiFi, KNX, advanced EMS) Provision of heavy equipment (cranes, lifts beyond standard scope) Construction and finishing works (masonry, painting, structural adaptations) Right of Withdrawal (EU Consumers) Consumers have the statutory right of withdrawal in accordance with applicable consumer protection laws. Early Expiry of the Right of Withdrawal: The right of withdrawal may expire prematurely if the customer expressly requests that the service begins before the end of the withdrawal period and acknowledges that the right of withdrawal is lost once the service has been fully performed. Individually Configured Systems: For system components that are individually configured, pre-assembled, or tailored to customer specifications, the right of withdrawal may be excluded where legally permitted. Project Scheduling: Installation dates are scheduled after order confirmation within a defined execution window. If performance cannot be carried out due to reasons attributable to the customer (e.g. lack of access or missing prerequisites), additional costs may apply. This structured approach ensures a transparent, efficient, and technically compliant installation with clearly defined responsibilities and cost allocation.

€11,693.00*
Coolenvi™ Programming Automatic Restart After Power Fail
Coolenvi™ Programming Automatic Restart After Power Fail
Item - Quantity: 1 Pc
This service includes the programming of automatic system restart after a power failure during HVAC commissioning. It ensures that the system automatically resumes operation once power is restored. The function is particularly critical for server rooms, IT environments and electrical control rooms, where uninterrupted climate control is essential to protect sensitive equipment. Professional configuration increases system availability, operational reliability and safeguards temperature-critical infrastructure. Scope of service: Activation of automatic restart after power failure Automatic return to predefined operating mode Improved system reliability and availability Protection of IT, server and technical rooms Professional implementation during commissioning

€110.00*
Coolenvi™ Programming of Setpoint Adjustment Limits
Coolenvi™ Programming of Setpoint Adjustment Limits
Item - Quantity: 1 Pc
Programming of Setpoint Adjustment Limits for Cooling / Heating / Dehumidification Modes. This service includes the professional programming of setpoint adjustment limits during system commissioning. The adjustable temperature ranges for cooling, heating, and dehumidification modes are specifically restricted to ensure energy-efficient and reliable system operation. By limiting user-adjustable setpoints, inefficient or system-critical settings are prevented. This reduces energy consumption, protects system components, and ensures stable comfort conditions. Scope of service: Setpoint adjustment limits for cooling, heating, and dehumidification Prevention of incorrect operation and unnecessary energy use Improved system safety and component protection Optimized energy efficiency and operating costs Professional implementation during commissioning

€110.00*

Why Are These BIMdepot™ Items Listed?


BIMdepot™ items are internal tools for our technicians. You don't need to choose them yourself — our BIM Facility Manager coordinates all required equipment. The items are shown for transparency and may be added during checkout if you wish to support on-site preparation.

coolenvi-BIMservice-consulting-female-recommendation.png?ts=1764251300
Rental product
BIMdepot | Operational Fork-Lift
BIMdepot | Operational Fork-Lift
BIMdepot Filter: Air Handling Technology | Task - Duration: 1 Day | Task - Work Location: DE - From Essen
This fork lift is used by our technician for the professional installation and positioning of heavy or bulky system components, particularly on façades or in ground-level outdoor areas. The maximum lifting height is 2.52 m. Installation tasks that cannot be safely or economically reached with this lift generally require the use of a suitable mobile crane. For various tasks, we additionally recommend the following equipment: If the item is listed as a rental product in your sales channel, shipment should normally be carried out using the Coolenvi service vehicle. Please note that, for logistical reasons, these leasing items cannot be shipped by air freight. If you are located on an island or abroad, please check the shipping method and equipment availability in advance to avoid delays. Coolenvi is a certified specialist company for sustainable services in accordance with the Chemicals and Climate Protection Regulation 303/2008 and Implementing Regulation (EU) 2015/2066.

€368.00*
Rental product
BIMdepot | Operational Infrared Camera
BIMdepot | Operational Infrared Camera
BIMdepot Filter: Air Handling Technology | Task - Work Location: DE - From Essen
This camera is used by our technician for thermography when diagnosing errors, thermodynamics and network loads. For various tasks, we also recommend the following equipment: If the item is listed as a rental item in your sales channel, it will normally have to be sent together with the Coolenvi service vehicle. Please note that due to logistical constraints, these leased items cannot be shipped by air freight. If you are on an island or abroad, please check the shipping method and device availability in advance to avoid delays. Coolenvi is a certified specialist company in sustainable services in accordance with the Chemicals and Climate Protection Regulation 303/2008 and the Implementing Regulation (EU) 2015/2066.

€162.00*
Rental product
BIMdepot | Operational Installation Tester IEC 60364-6/EN 50110
BIMdepot | Operational Installation Tester IEC 60364-6/EN 50110
BIMdepot Filter: Electrical engineering | Task - Duration: 1 Day | Task - Work Location: DE - From Essen
The testing device is used by our technicians to check installation while commissioning or even if in operation to ensure the cleanest supply of electricity for your demand, including electromagnetic compliance. We also recommend the following equipment for various tasks: Appliance Tester Cable Tester and much more... If the item is listed as a rental item in your sales channel, it must usually be shipped with the Coolenvi service vehicle. Please note that due to logistical restrictions, these rental items cannot be shipped by air freight. If your installation is on an island or overseas, please check the shipping method and equipment availability in advance to avoid delays. Coolenvi is a certified specialist company for sustainable service in accordance with the Chemicals Climate Protection Regulation 303/2008 and the Implementing Regulation (EU) 2015/2066.

€105.00*
Rental product
BIMdepot | Operational Personal Protective Equipment - Climbing
BIMdepot | Operational Personal Protective Equipment - Climbing
BIMdepot Filter: Air Handling Technology | Task - Duration: 1 Day | Task - Work Location: DE - From Essen
This personal protective equipment, consisting of a fall arrest harness and accessories, is used by our technician for professional inspection, supervision, work, installation and positioning on roofs or during work at height, mainly on façades, roofs, access balconies, balconies, balustrades or industrial facilities. Anything that cannot be reached safely or economically usually requires the use of a suitable lifting platform or aerial work platform. For various tasks, we additionally recommend the following equipment: If this item is offered as a rental product in your sales channel, shipment should generally be carried out using a Coolenvi service vehicle. Please note that, for logistical reasons, these leasing items cannot be shipped by air freight. If you are located on an island or abroad, please check the shipping method and equipment availability in advance to avoid delays. Coolenvi is a certified specialist company for sustainable services in accordance with Regulation 303/2008 on chemicals and climate protection and Implementing Regulation (EU) 2015/2066.

€15.00*
Rental product
BIMdepot | Operational Safety Tester DIN VDE 0701/0702
BIMdepot | Operational Safety Tester DIN VDE 0701/0702
BIMdepot Filter: Electrical engineering | Task - Work Location: DE - From Essen
The testing device is used by our technicians to regularly check office and household appliances for electrical safety. We also recommend the following equipment for various tasks: Installation Tester Cable Tester and much more... If the item is listed as a rental item in your sales channel, it must usually be shipped with the Coolenvi service vehicle. Please note that due to logistical restrictions, these rental items cannot be shipped by air freight. If your installation is on an island or overseas, please check the shipping method and equipment availability in advance to avoid delays. Coolenvi is a certified specialist company for sustainable service in accordance with the Chemicals Climate Protection Regulation 303/2008 and the Implementing Regulation (EU) 2015/2066.

€120.00*

BIMconnect™ delivers it to you

Many processes in technical trades can be efficiently digitised – however, mobility remains the key foundation in technical service. Coolenvi™ provides the appropriate electric mobility. From person to person.

BIMconnect™ route planning is already integrated into maintenance via BIMcare™ or individually via BIMservice™.

Indication of BIMconnect mobility products in the lower section
BIMconnect | Business trip in Denmark
BIMconnect | Business trip in Denmark
Your next Service-Hub: DK|Ribe 20/40 Km
The CO₂-optimized travel of our technicians is an integral part of your supply chain. It supports you in reliably meeting both regulatory and internal sustainability and emissions reduction requirements – without any additional organizational effort. Your Advantage: A Sustainable Supply Chain Without Additional Effort Each journey is carried out as part of a climate-friendly overall concept. You benefit from: Support in meeting ESG and sustainability requirements Reduction of CO₂ emissions within your supply chain Transparent integration into your environmental and compliance strategy Plannable operations without additional coordination effort Charging Times (approx. 25 kWh / 100 km) Distance AC 3.7 kW AC 7.4 kW DC 100 kW Route Total ~22 h (0–100%) ~11 h (0–100%) ~40 min (0–100%) Up to 50 km 100 km 7 h 3:30 h 0:40 h 51–100 km 200 km 14 h 7 h 0:50 h 101–150 km 300 km 20 h 10:30 h 1 h 151–200 km 400 km 26:40 h 14 h 1:30 h 201–250 km 500 km 33:30 h 18 h 2 h 251–300 km 600 km 40 h 21 h 2:30 h 301–500 km 1000 km 67 h 35 h 4 h 501–600 km 1200 km 80 h 41:30 h 4:30 h 601–800 km 1600 km 107 h 55 h 5:30 h 801–1000 km 2000 km 133 h 69 h 8 h

Variants from €1.85*
€73.95*
BIMconnect | Business trip Germany-France
BIMconnect | Business trip Germany-France
Your next Service-Hub: DE|Essen > FR|Mauvieres 870/1740 km
The CO₂-optimized travel of our technicians is an integral part of your supply chain. It supports you in reliably meeting legal and internal requirements for sustainability and emission reduction – without additional organizational effort. Your advantage: Sustainable supply chain without additional effort Each journey is carried out as part of a climate-friendly overall concept. You benefit from: Support in meeting ESG and sustainability requirements Reduction of CO₂ emissions within your supply chain Transparent integration into your environmental and compliance strategy Predictable deployment times without additional coordination Charging times (approx. 25 kWh / 100 km) Distance AC 3.7 kW AC 7.4 kW DC 100 kW Route Total ~22 h (0–100%) ~11 h (0–100%) ~40 min (0–100%) Up to 50 km 100 km 7 h 3:30 h 0:40 h 51–100 km 200 km 14 h 7 h 0:50 h 101–150 km 300 km 20 h 10:30 h 1 h 151–200 km 400 km 26:40 h 14 h 1:30 h 201–250 km 500 km 33:30 h 18 h 2 h 251–300 km 600 km 40 h 21 h 2:30 h 301–500 km 1000 km 67 h 35 h 4 h 501–600 km 1200 km 80 h 41:30 h 4:30 h 601–800 km 1600 km 107 h 55 h 5:30 h 801–1000 km 2000 km 133 h 69 h 8 h

Variants from €1.85*
€3,219.00*
BIMconnect | Business trip in Western Cape
BIMconnect | Business trip in Western Cape
Your next Service-Hub: ZA|George 20/40 Km
The CO₂-optimized travel of our technicians is an integral part of your supply chain. It supports you in reliably meeting both regulatory and internal sustainability and emissions reduction requirements – without any additional organizational effort. Your Advantage: A Sustainable Supply Chain Without Additional Effort Each journey is carried out as part of a climate-friendly overall concept. You benefit from: Support in meeting ESG and sustainability requirements Reduction of CO₂ emissions within your supply chain Transparent integration into your environmental and compliance strategy Plannable operations without additional coordination effort Charging Times (approx. 25 kWh / 100 km) Distance AC 3.7 kW AC 7.4 kW DC 100 kW Route Total ~22 h (0–100%) ~11 h (0–100%) ~40 min (0–100%) Up to 50 km 100 km 7 h 3:30 h 0:40 h 51–100 km 200 km 14 h 7 h 0:50 h 101–150 km 300 km 20 h 10:30 h 1 h 151–200 km 400 km 26:40 h 14 h 1:30 h 201–250 km 500 km 33:30 h 18 h 2 h 251–300 km 600 km 40 h 21 h 2:30 h 301–500 km 1000 km 67 h 35 h 4 h 501–600 km 1200 km 80 h 41:30 h 4:30 h 601–800 km 1600 km 107 h 55 h 5:30 h 801–1000 km 2000 km 133 h 69 h 8 h

Variants from €0.50*
€20.00*
BIMconnect | Business trip in Germany
BIMconnect | Business trip in Germany
Your next Service-Hub: DE|Essen 20/40 km
The CO₂-optimized travel of our technicians is an integral part of your supply chain. It supports you in reliably meeting legal and internal requirements for sustainability and emission reduction – without additional organizational effort. Your advantage: Sustainable supply chain without additional effort Each journey is carried out as part of a climate-friendly overall concept. You benefit from: Support in meeting ESG and sustainability requirements Reduction of CO₂ emissions within your supply chain Transparent integration into your environmental and compliance strategy Predictable deployment times without additional coordination Charging times (approx. 25 kWh / 100 km) Distance AC 3.7 kW AC 7.4 kW DC 100 kW Route Total ~22 h (0–100%) ~11 h (0–100%) ~40 min (0–100%) Up to 50 km 100 km 7 h 3:30 h 0:40 h 51–100 km 200 km 14 h 7 h 0:50 h 101–150 km 300 km 20 h 10:30 h 1 h 151–200 km 400 km 26:40 h 14 h 1:30 h 201–250 km 500 km 33:30 h 18 h 2 h 251–300 km 600 km 40 h 21 h 2:30 h 301–500 km 1000 km 67 h 35 h 4 h 501–600 km 1200 km 80 h 41:30 h 4:30 h 601–800 km 1600 km 107 h 55 h 5:30 h 801–1000 km 2000 km 133 h 69 h 8 h

Variants from €1.85*
€74.00*
Tip
BIMconnect | Overnight stay Accommodation - Travel expenses
BIMconnect | Overnight stay Accommodation - Travel expenses
Task - Work Location: DE - From Essen
If our staff is required on site, please also book the corresponding accommodation costs together with other BIM packages. Choose according to the defined location This accommodation package is valid for one person. It is provided as part of BIM Facility Management, BIMcare™, BIMservice™ or BIM-Management depending on route planning, seasonal requirements or urgency. Please note that this package must be booked on a daily basis and in line with the order: In the event of deviations, subsequent bookings are required before the contract is concluded, as no one should sleep on the street and we attach great importance to an optimal working atmosphere. If the employees work more than 4 days per week, overnight accommodation must be booked according to the daily flat rate, including at weekends. If the duration of the business trip or the travel times are not sufficient, weekends must be considered as standby time, but must be booked separately by the customer and at their own expense. Fully configure supply chains Ideally, a booking of 4 days per week, Monday to Thursday, is recommended. Please note that this is not an all-inclusive offer. Travel costs and work equipment are not included and can be found under BIMpilot™ or BIMservice™.

€120.00*
BIMconnect | International Air Freight Logistic
BIMconnect | International Air Freight Logistic
BIMpilot - International Air Freight Logistic: Billund - Cape Town / 1 Person / 0 Kg 💚 1.28 t CO₂ ~ 76.98 €
Our sustainable and customer-friendly solution enables the safe and efficient transport of people and permitted goods on international flight routes and within Europe. We combine speed, environmental responsibility, and legal certainty for your transport needs. What we transport Specialists for assignments at the destination Permitted goods, spare parts, and documents Other non-perishable, non-hazardous goods compliant with international aviation regulations What we do not transport For safety and legal reasons, we cannot transport the following goods: Animals of any kind Chilled or frozen goods Hazardous or legally prohibited goods Batteries (e.g. LiFePO4) or other lithium batteries in large quantities Liquids exceeding permitted air transport limits Gases, pressure containers, or compressed substances Explosive, flammable, or chemically aggressive substances Other goods prohibited under international aviation or safety regulations Customer notice: Pickup at destination Our service exclusively includes, depending on the option, national or international air transport. Delivery within the destination country or domestic transport at the destination is not included. The customer must collect the goods at the destination unless local transport has been booked. Freight is only transported from our warehouse on one route. Mobility at the destination, storage, parking, transfer, and accommodation costs are optional and must be borne and arranged by the customer. The total price depends on the selected options. Your advantage Fast and predictable availability of specialists and goods Sustainable, efficient, and legally compliant execution English as the business language for international operations Total price composition Description Price in EUR excl. VAT 1. Mobility at departure location - no Km 200.00 2. Mobility at destination - no Km 200.00 3. Non-EU round-trip ticket per person 2,100.00 4. EU round-trip ticket per person 300.00 5. One-way surcharge per 31 kg freight 300.00 6. Parking / transfer costs per location per vehicle/month if required 150.00 7. Overnight stay per night / person 120.00

Variants from €758.40*
€2,620.00*
BIMconnect | Business trip Denmark-Germany
BIMconnect | Business trip Denmark-Germany
Your next Service-Hub: DK|Ribe > DE|Essen 580/1160 Km
The CO₂-optimized travel of our technicians is an integral part of your supply chain. It supports you in reliably meeting legal and internal requirements for sustainability and emission reduction – without additional organizational effort. Your advantage: Sustainable supply chain without additional effort Each journey is carried out as part of a climate-friendly overall concept. You benefit from: Support in meeting ESG and sustainability requirements Reduction of CO₂ emissions within your supply chain Transparent integration into your environmental and compliance strategy Predictable deployment times without additional coordination Charging times (approx. 25 kWh / 100 km) Distance AC 3.7 kW AC 7.4 kW DC 100 kW Route Total ~22 h (0–100%) ~11 h (0–100%) ~40 min (0–100%) Up to 50 km 100 km 7 h 3:30 h 0:40 h 51–100 km 200 km 14 h 7 h 0:50 h 101–150 km 300 km 20 h 10:30 h 1 h 151–200 km 400 km 26:40 h 14 h 1:30 h 201–250 km 500 km 33:30 h 18 h 2 h 251–300 km 600 km 40 h 21 h 2:30 h 301–500 km 1000 km 67 h 35 h 4 h 501–600 km 1200 km 80 h 41:30 h 4:30 h 601–800 km 1600 km 107 h 55 h 5:30 h 801–1000 km 2000 km 133 h 69 h 8 h

Variants from €1.85*
€2,146.00*
BIMconnect | Business trip Denmark-Netherlands
BIMconnect | Business trip Denmark-Netherlands
Your next Service-Hub: DK|Ribe > NL|Winterswijk 580/1160 Km
The CO₂-optimized travel of our technicians is an integral part of your supply chain. It supports you in reliably meeting legal and internal requirements for sustainability and emission reduction – without additional organizational effort. Your advantage: Sustainable supply chain without additional effort Each journey is carried out as part of a climate-friendly overall concept. You benefit from: Support in meeting ESG and sustainability requirements Reduction of CO₂ emissions within your supply chain Transparent integration into your environmental and compliance strategy Predictable deployment times without additional coordination Charging times (approx. 25 kWh / 100 km) Distance AC 3.7 kW AC 7.4 kW DC 100 kW Route Total ~22 h (0–100%) ~11 h (0–100%) ~40 min (0–100%) Up to 50 km 100 km 7 h 3:30 h 0:40 h 51–100 km 200 km 14 h 7 h 0:50 h 101–150 km 300 km 20 h 10:30 h 1 h 151–200 km 400 km 26:40 h 14 h 1:30 h 201–250 km 500 km 33:30 h 18 h 2 h 251–300 km 600 km 40 h 21 h 2:30 h 301–500 km 1000 km 67 h 35 h 4 h 501–600 km 1200 km 80 h 41:30 h 4:30 h 601–800 km 1600 km 107 h 55 h 5:30 h 801–1000 km 2000 km 133 h 69 h 8 h

€2,146.00*