Pragmatism counts on construction sites. We rely on solution-oriented project management for construction projects.
With our experience as a plant manufacturer, we offer clear structures for planners, craftsmen and project participants.
BIM-Manager already selected?
We relieve you as an operator, investor or builder in your project. It is not necessary that you put together BIMpilot™, BIM-Design, BIMphases™ alone. We at Coolenvi recommend the perfect manpower for the tool, as our BIM Manager can do it for you. By the way, you also get an excellent project manager at your side.
Task - Work Location:
Remote
|
Weekly model:
4 days/week
I support technical companies, goods traders, and construction project owners in the legally compliant and transparent execution of their projects. As a BIM Manager and external Anti-Money Laundering (AML) Officer, I connect technical, commercial, and legal processes into a consistent, auditable system.
My scope of work includes:
Integrating AML prevention and risk assessment into technical and commercial workflows
Monitoring and tracking capital, payment, and supply chain flows
Supporting compliance with AML, ESG, and Supply Chain Due Diligence requirements
Developing digital proof structures within BIM or ERP systems (transparency of ownership, origin, and contracts)
Managing interfaces between technical design, financial control, and legal assurance
Training and supporting project teams, suppliers, and subcontractors
Target group:
Construction companies, engineering firms, plant manufacturers, technical service providers, goods traders, investors, and clients with increased compliance demands.
Your benefits:
Full transparency of goods, money, and information flows
Reduced liability and reputational risks
Digital documentation of all legally relevant evidence
Efficient integration into existing BIM, ERP, and project structures
Service format:
Online consulting, on-site project integration, external AML appointment, audits, and reporting in line with EU and national AML standards.
Practical. Transparent. Compliant.
Your partner for BIM-based Anti-Money Laundering compliance in technical and economic environments.
Always configure supply chains completely
Ideally 4 days per week, Monday to Thursday. This is not an all-inclusive service; travel expenses and work materials are not included and can be found under BIMpilot™ or BIMphases™.
Language Version:
English
|
Task - Work Location:
DK - From Ribe
The digital project manager is practical and works remotely. Buildings are increasingly being operated in a climate-neutral way as a result.
The BIM Manager opens up new horizons
BIM management is an unknown field for many. It is by no means just about software, because practical experience is essential. Instead of just being able to see dotted lines on the screen, our BIM Manager has a profound understanding of all the trades involved. The whole thing is comparable to video conferences with a mirror image of the building. But there are no remote activities. However, we are preparing for on-site operations along the supply chain and buildings are operated much more economically, promptly and sustainably.
Always configure supply chains completely
Ideally a 4-day week from Monday to Thursday. This is not an all-inclusive package, travel costs and work materials are not included and can be found under BIMpilot or BIMphase.
Task - Work Location:
Remote
|
Weekly model:
4 days/week
I am the first strategic project success. Tenders are created first before project execution starts.
The advantage of a strategic BIM Manager
I'm the early bird in the project. The recommendation for builders, investors and operators, is because the assessment brochure offers suitable contractual partners:
General contractor
Project management
Object monitoring
Construction management
What strategic BIM Managers achieveCompetitors, general contractors, engineering offices or architects are increasingly offering BIM management. Unfortunately, without independence, conflicts of interest arise.
The advantage is my independent advice
BIM implementation
Definition of standards & Guidelines
Definition of Process & Workflow
Creation of AIA (client information request)
Creation of preliminary BAP (BIM processing plan)
Update of the BAP
and so much more...BIM strategy is complex. As a strategic BIM Manager, I organize the awarding of contracts to suit requirements. My strategy is always the teamwork, even if I'm not there, I'm not gone. Tracking, checking and viewing the entire project will then be possible online for every stakeholder.I do combine services from well-known job titles:Planning coordinator - coordination , testing and team managementBuilder consultant - advice, strategy, supervision and organizationProject manager - management, plant construction, installer, project costs Project manager - milestone dates, process variants, decision-making processesObject supervisor - higher-level team management
Always fully configure supply chains
Ideally a 4-day week from Monday to Thursday. This is not an all-inclusive package, travel costs and work materials are not included and can be found under BIMpilot or BIMphase.
Your next Service-Hub:
DK|Ribe > NL|Winterswijk 580/1160 Km
The CO₂-optimized travel of our technicians is an integral part of your supply chain. It supports you in reliably meeting legal and internal requirements for sustainability and emission reduction – without additional organizational effort.
Your advantage: Sustainable supply chain without additional effort
Each journey is carried out as part of a climate-friendly overall concept. You benefit from:
Support in meeting ESG and sustainability requirements
Reduction of CO₂ emissions within your supply chain
Transparent integration into your environmental and compliance strategy
Predictable deployment times without additional coordination
Charging times (approx. 25 kWh / 100 km)
Distance
AC 3.7 kW
AC 7.4 kW
DC 100 kW
Route
Total
~22 h (0–100%)
~11 h (0–100%)
~40 min (0–100%)
Up to 50 km
100 km
7 h
3:30 h
0:40 h
51–100 km
200 km
14 h
7 h
0:50 h
101–150 km
300 km
20 h
10:30 h
1 h
151–200 km
400 km
26:40 h
14 h
1:30 h
201–250 km
500 km
33:30 h
18 h
2 h
251–300 km
600 km
40 h
21 h
2:30 h
301–500 km
1000 km
67 h
35 h
4 h
501–600 km
1200 km
80 h
41:30 h
4:30 h
601–800 km
1600 km
107 h
55 h
5:30 h
801–1000 km
2000 km
133 h
69 h
8 h
The CO₂-optimized travel of our technicians is an integral part of your supply chain.
It supports you in reliably meeting both regulatory and internal sustainability and emissions reduction requirements – without any additional organizational effort.
Your Advantage: A Sustainable Supply Chain Without Additional Effort
Each journey is carried out as part of a climate-friendly overall concept. You benefit from:
Support in meeting ESG and sustainability requirements
Reduction of CO₂ emissions within your supply chain
Transparent integration into your environmental and compliance strategy
Plannable operations without additional coordination effort
Charging Times (approx. 25 kWh / 100 km)
Distance
AC 3.7 kW
AC 7.4 kW
DC 100 kW
Route
Total
~22 h (0–100%)
~11 h (0–100%)
~40 min (0–100%)
Up to 50 km
100 km
7 h
3:30 h
0:40 h
51–100 km
200 km
14 h
7 h
0:50 h
101–150 km
300 km
20 h
10:30 h
1 h
151–200 km
400 km
26:40 h
14 h
1:30 h
201–250 km
500 km
33:30 h
18 h
2 h
251–300 km
600 km
40 h
21 h
2:30 h
301–500 km
1000 km
67 h
35 h
4 h
501–600 km
1200 km
80 h
41:30 h
4:30 h
601–800 km
1600 km
107 h
55 h
5:30 h
801–1000 km
2000 km
133 h
69 h
8 h
The CO₂-optimized travel of our technicians is an integral part of your supply chain.
It supports you in reliably meeting both regulatory and internal sustainability and emissions reduction requirements – without any additional organizational effort.
Your Advantage: A Sustainable Supply Chain Without Additional Effort
Each journey is carried out as part of a climate-friendly overall concept. You benefit from:
Support in meeting ESG and sustainability requirements
Reduction of CO₂ emissions within your supply chain
Transparent integration into your environmental and compliance strategy
Plannable operations without additional coordination effort
Charging Times (approx. 25 kWh / 100 km)
Distance
AC 3.7 kW
AC 7.4 kW
DC 100 kW
Route
Total
~22 h (0–100%)
~11 h (0–100%)
~40 min (0–100%)
Up to 50 km
100 km
7 h
3:30 h
0:40 h
51–100 km
200 km
14 h
7 h
0:50 h
101–150 km
300 km
20 h
10:30 h
1 h
151–200 km
400 km
26:40 h
14 h
1:30 h
201–250 km
500 km
33:30 h
18 h
2 h
251–300 km
600 km
40 h
21 h
2:30 h
301–500 km
1000 km
67 h
35 h
4 h
501–600 km
1200 km
80 h
41:30 h
4:30 h
601–800 km
1600 km
107 h
55 h
5:30 h
801–1000 km
2000 km
133 h
69 h
8 h
BIMpilot - International Air Freight Logistic:
Billund - Cape Town / 1 Person / 0 Kg 💚 1.28 t CO₂ ~ 76.98 €
Our sustainable and customer-friendly solution enables the safe and efficient transport of people and permitted goods on international flight routes and within Europe. We combine speed, environmental responsibility, and legal certainty for your transport needs.
What we transport
Specialists for assignments at the destination
Permitted goods, spare parts, and documents
Other non-perishable, non-hazardous goods compliant with international aviation regulations
What we do not transport
For safety and legal reasons, we cannot transport the following goods:
Animals of any kind
Chilled or frozen goods
Hazardous or legally prohibited goods
Batteries (e.g. LiFePO4) or other lithium batteries in large quantities
Liquids exceeding permitted air transport limits
Gases, pressure containers, or compressed substances
Explosive, flammable, or chemically aggressive substances
Other goods prohibited under international aviation or safety regulations
Customer notice: Pickup at destination
Our service exclusively includes, depending on the option, national or international air transport. Delivery within the destination country or domestic transport at the destination is not included. The customer must collect the goods at the destination unless local transport has been booked. Freight is only transported from our warehouse on one route. Mobility at the destination, storage, parking, transfer, and accommodation costs are optional and must be borne and arranged by the customer. The total price depends on the selected options.
Your advantage
Fast and predictable availability of specialists and goods
Sustainable, efficient, and legally compliant execution
English as the business language for international operations
Total price composition
Description
Price in EUR excl. VAT
1. Mobility at departure location - no Km
200.00
2. Mobility at destination - no Km
200.00
3. Non-EU round-trip ticket per person
2,100.00
4. EU round-trip ticket per person
300.00
5. One-way surcharge per 31 kg freight
300.00
6. Parking / transfer costs per location per vehicle/month if required
150.00
7. Overnight stay per night / person
120.00
Language Version:
English
|
Task - OHS Service:
One-day site inspection
|
Task - Work Location:
ZA - From George
Construction sites require clear rules, safe procedures, and professional supervision. Our OHS Coordinator (Occupational Safety and Health Coordinator) supports you on-site or remotely – assessing risks, reviewing workflows, and creating tailored instructions for safe operations.
Choosing the right deployment location
Select the deployment location that best suits your project. Each location applies exclusively to on-site visits. This selection does not cover purely remote creation of documents (e.g., OHS Plan, risk assessments, or updates thereof).
Clarity and safety on construction sites
Workplace safety is more than meeting formal requirements. Our HSE Coordinator brings structure, experience, and clear guidance to your team – on-site or digitally. Instead of abstract rules, you receive practical orientation that translates complex regulations into safe and efficient routines – for new builds, renovations, or maintenance.
Every site visit or remote session increases transparency, reliability, and resilience. Safety becomes part of a culture that supports productivity and long-term success.
Our services at a glance
Risk assessment and hazard evaluation
Creation and updating of OHS plans
Coordination according to construction site regulations (ConstructionReg)
Instruction and safety management on-site or remotely
Fully configure supply chains
The standard covers 4 working days per week (Monday–Thursday). This is not an all-inclusive offer. Travel expenses and work materials are not included – relevant items can be found under BIMpilot™ or BIMphases™.
€320.00*
The BIM Manager is multi-talented
in many specialist trades in construction which also achieve the ESG goals.