Skip to main content

BIM Facility Manager – Digital, Future-proof & On-Site

Modern building management with innovative maintenance coordination and third-party company management. For smooth operation – flexible, climate-neutral & without long-term contracts.

Login myBranchtool CAFM

How BIMcare™ supports your building operations

BIMcare™ combines digital building management with operational support on site. The BIM Facility Manager takes over the technical coordination, maintenance and control of external companies, while the BIM Manager is responsible for digital planning, project management and contract management. By using 3D models, CAFM, technical data and BIM-Design, the facility manager receives the necessary tools to make building operations efficient and sustainable.

If defects are discovered during maintenance or service, BIMcare™ also provides structured aftercare: repair offers, recommendations for action and budget approvals can either be coordinated by the facility manager or controlled directly by the client. This means your building will always remain in optimal condition without you having to worry about every detail. With BIMcare™, modern building management becomes transparent, economical and sustainable - without long-term commitments.

Filter
BIMconnect | International Air Freight Logistic
BIMconnect | International Air Freight Logistic
BIMpilot - International Air Freight Logistic: Billund - Cape Town / 1 Person / 0 Kg 💚 1.28 t CO₂ ~ 76.98 €
Our sustainable and customer-friendly solution enables the safe and efficient transport of people and permitted goods on international flight routes and within Europe. We combine speed, environmental responsibility, and legal certainty for your transport needs. What we transport Specialists for assignments at the destination Permitted goods, spare parts, and documents Other non-perishable, non-hazardous goods compliant with international aviation regulations What we do not transport For safety and legal reasons, we cannot transport the following goods: Animals of any kind Chilled or frozen goods Hazardous or legally prohibited goods Batteries (e.g. LiFePO4) or other lithium batteries in large quantities Liquids exceeding permitted air transport limits Gases, pressure containers, or compressed substances Explosive, flammable, or chemically aggressive substances Other goods prohibited under international aviation or safety regulations Customer notice: Pickup at destination Our service exclusively includes, depending on the option, national or international air transport. Delivery within the destination country or domestic transport at the destination is not included. The customer must collect the goods at the destination unless local transport has been booked. Freight is only transported from our warehouse on one route. Mobility at the destination, storage, parking, transfer, and accommodation costs are optional and must be borne and arranged by the customer. The total price depends on the selected options. Your advantage Fast and predictable availability of specialists and goods Sustainable, efficient, and legally compliant execution English as the business language for international operations Total price composition Description Price in EUR excl. VAT 1. Mobility at departure location - no Km 200.00 2. Mobility at destination - no Km 200.00 3. Non-EU round-trip ticket per person 2,100.00 4. EU round-trip ticket per person 300.00 5. One-way surcharge per 31 kg freight 300.00 6. Parking / transfer costs per location per vehicle/month if required 150.00 7. Overnight stay per night / person 120.00

Variants from R 14 257,92*
R 49 256,00*
BIMconnect | Business trip Denmark-Netherlands
BIMconnect | Business trip Denmark-Netherlands
Your next Service-Hub: DK|Ribe > NL|Winterswijk 580/1160 Km
The CO₂-optimized travel of our technicians is an integral part of your supply chain. It supports you in reliably meeting legal and internal requirements for sustainability and emission reduction – without additional organizational effort. Your advantage: Sustainable supply chain without additional effort Each journey is carried out as part of a climate-friendly overall concept. You benefit from: Support in meeting ESG and sustainability requirements Reduction of CO₂ emissions within your supply chain Transparent integration into your environmental and compliance strategy Predictable deployment times without additional coordination Charging times (approx. 25 kWh / 100 km) Distance AC 3.7 kW AC 7.4 kW DC 100 kW Route Total ~22 h (0–100%) ~11 h (0–100%) ~40 min (0–100%) Up to 50 km 100 km 7 h 3:30 h 0:40 h 51–100 km 200 km 14 h 7 h 0:50 h 101–150 km 300 km 20 h 10:30 h 1 h 151–200 km 400 km 26:40 h 14 h 1:30 h 201–250 km 500 km 33:30 h 18 h 2 h 251–300 km 600 km 40 h 21 h 2:30 h 301–500 km 1000 km 67 h 35 h 4 h 501–600 km 1200 km 80 h 41:30 h 4:30 h 601–800 km 1600 km 107 h 55 h 5:30 h 801–1000 km 2000 km 133 h 69 h 8 h

R 40 344,80*
BIM Manager - Operative
BIM Manager - Operative
Language Version: English | Task - Work Location: ZA - From George
The digital project manager is practical and works remotely. Buildings are increasingly being operated in a climate-neutral way as a result. The BIM Manager opens up new horizons BIM management is an unknown field for many. It is by no means just about software, because practical experience is essential. Instead of just being able to see dotted lines on the screen, our BIM Manager has a profound understanding of all the trades involved. The whole thing is comparable to video conferences with a mirror image of the building. But there are no remote activities. However, we are preparing for on-site operations along the supply chain and buildings are operated much more economically, promptly and sustainably. Always configure supply chains completely Ideally a 4-day week from Monday to Thursday. This is not an all-inclusive package, travel costs and work materials are not included and can be found under BIMpilot or BIMphase.

R 7 520,00*
Tip
BIM Facility Manager
BIM Facility Manager
Task - Work Location: ZA - From George
The modern BIM Facility Manager, like a "caretaker", ensures environmentally friendly operation of the building and technology. A digital, scheduled and organised way. What are the advantages with BIM Facility Manager? Technology and buildings are organised economically, including operator obligations. This ensures repairs, maintenance and the organised deployment of specialists. External contracts with BIM-CAFM are monitored according to generally accepted technical standards. BIM Facility Management knows more than just mechanics, fire protection, construction technology, MSR or refrigeration technology. How BIM Facility Managers work with buildings? In general, every building needs a 3D model and, if necessary, it will be created for you. This is the basis for the climate-neutral concept for building management. Additionally, a digital platform for BIM-CAFM will be mandatory, which you can obtain through our BIM Manager. Where are maintenance contracts offered? This can be found under the category BIMcare™. Always fully configure supply chains This is ideally suited for a 4-day work week, Monday through Thursday. This is not an all-inclusive package; travel expenses and materials are not included and can be found at BIMdepot™, BIMcare™, BIMpilot™, or BIMphase™. BIMcare™ customers automatically receive a discount on this item.

R 6 392,00*
OHS Occupational Health and Safety Coordinator - Construction
OHS Occupational Health and Safety Coordinator - Construction
Language Version: English | Task - OHS Service: One-day site inspection | Task - Work Location: ZA - From George
Construction sites require clear rules, safe procedures, and professional supervision. Our OHS (Occupational Safety and Health Coordinator) supports you on-site or remotely – assessing risks, reviewing workflows, and creating tailored instructions for safe operations. Choosing the right deployment location Select the deployment location that best suits your project. Each location applies exclusively to on-site visits in the respective area. This selection does not cover purely remote creation of documents (e.g., HSE Plan, risk assessments, or updates thereof). Clarity and safety on construction sites Workplace safety is more than meeting formal requirements. Our HSE Coordinator brings structure, experience, and clear guidance to your team – on-site or digitally. Instead of abstract rules, you receive practical orientation that translates complex regulations into safe and efficient routines – for new builds, renovations, or maintenance. Every site visit or remote session increases transparency, reliability, and resilience. Safety becomes part of a culture that supports productivity and long-term success. Our services at a glance Risk assessment and hazard evaluation Creation and updating of HSE plans Coordination according to construction site regulations (ConstructionReg) Instruction and safety management on-site or remotely Fully configure supply chains The standard covers 4 working days per week (Monday–Thursday). This is not an all-inclusive offer. Travel expenses and work materials are not included – relevant items can be found under BIMpilot™ or BIMphases™.

R 6 016,00*
BIMconnect | Business trip in Denmark
BIMconnect | Business trip in Denmark
Your next Service-Hub: DK|Ribe 20/40 Km
The CO₂-optimized travel of our technicians is an integral part of your supply chain. It supports you in reliably meeting both regulatory and internal sustainability and emissions reduction requirements – without any additional organizational effort. Your Advantage: A Sustainable Supply Chain Without Additional Effort Each journey is carried out as part of a climate-friendly overall concept. You benefit from: Support in meeting ESG and sustainability requirements Reduction of CO₂ emissions within your supply chain Transparent integration into your environmental and compliance strategy Plannable operations without additional coordination effort Charging Times (approx. 25 kWh / 100 km) Distance AC 3.7 kW AC 7.4 kW DC 100 kW Route Total ~22 h (0–100%) ~11 h (0–100%) ~40 min (0–100%) Up to 50 km 100 km 7 h 3:30 h 0:40 h 51–100 km 200 km 14 h 7 h 0:50 h 101–150 km 300 km 20 h 10:30 h 1 h 151–200 km 400 km 26:40 h 14 h 1:30 h 201–250 km 500 km 33:30 h 18 h 2 h 251–300 km 600 km 40 h 21 h 2:30 h 301–500 km 1000 km 67 h 35 h 4 h 501–600 km 1200 km 80 h 41:30 h 4:30 h 601–800 km 1600 km 107 h 55 h 5:30 h 801–1000 km 2000 km 133 h 69 h 8 h

Variants from R 34,76*
R 1 390,25*
BIMconnect | Business trip in Western Cape
BIMconnect | Business trip in Western Cape
Your next Service-Hub: ZA|George 20/40 Km
The CO₂-optimized travel of our technicians is an integral part of your supply chain. It supports you in reliably meeting both regulatory and internal sustainability and emissions reduction requirements – without any additional organizational effort. Your Advantage: A Sustainable Supply Chain Without Additional Effort Each journey is carried out as part of a climate-friendly overall concept. You benefit from: Support in meeting ESG and sustainability requirements Reduction of CO₂ emissions within your supply chain Transparent integration into your environmental and compliance strategy Plannable operations without additional coordination effort Charging Times (approx. 25 kWh / 100 km) Distance AC 3.7 kW AC 7.4 kW DC 100 kW Route Total ~22 h (0–100%) ~11 h (0–100%) ~40 min (0–100%) Up to 50 km 100 km 7 h 3:30 h 0:40 h 51–100 km 200 km 14 h 7 h 0:50 h 101–150 km 300 km 20 h 10:30 h 1 h 151–200 km 400 km 26:40 h 14 h 1:30 h 201–250 km 500 km 33:30 h 18 h 2 h 251–300 km 600 km 40 h 21 h 2:30 h 301–500 km 1000 km 67 h 35 h 4 h 501–600 km 1200 km 80 h 41:30 h 4:30 h 601–800 km 1600 km 107 h 55 h 5:30 h 801–1000 km 2000 km 133 h 69 h 8 h

Variants from R 9,40*
R 376,00*