High-performance wet and dry vacuum cleaner for rental and operational use. Designed for efficient removal of water, sludge, and construction debris on building sites and technical installations.
A robust solution for demanding cleaning tasks where high suction power and operational reliability are essential.
0 of 0 reviews
Average rating of 0 out of 5 stars
Leave a review!
Share your experiences with other customers.
Login
No reviews found. Share your insights with others.
Task - E&IC :
IC | Replace Motor protection control
|
Task - Work Location:
ZA - From George
The Electric, Instrumentation, Controls, and Automation Engineer is the one solution for the well-regulated operation of building technologies — the economically effective.
How our climate-neutral E&IC Engineer works
First, a comprehensive analysis of the potential causes of failure and the components involved would be required to identify possible vulnerabilities. Based on this, updates or upgrades to valves, pumps, and other relevant equipment could be considered to ensure more reliable performance. Integrating more advanced technology, perhaps incorporating IoT devices for remote monitoring and control, could also improve the effectiveness of the system. In this way, we minimize maintenance and repair times and increase operational efficiency. Additionally, we incorporate environmentally friendly practices to make operations more carbon neutral and realize long-term cost savings.
Always fully configure supply chains
This is ideally suited for a 4-day work week, Monday through Thursday. This is not an all-inclusive package; travel expenses and materials are not included and can be found at BIMdepot™, BIMcare™, BIMpilot™, or BIMphase™. BIMcare™ customers automatically receive a discount on this item.
Measurement, optimization or consulting? We offer this service on-site or remotely for one hour, tailored to your specific needs.
What are the advantages of a BIMcare™ maintenance contract?
After maintenance is performed under BIMcare™, we will reimburse 50% of the cost of a fault diagnosis, provided that the resulting repair quotes are commissioned and BIMcare™ is subsequently continued continuously for at least 12 months.
Even without BIMcare™, a cost-effective remote service is available via WhatsApp.
Always configure supply chains completely
This is ideally suited for a 4-day work week, Monday through Thursday. This is not an all-inclusive package; travel expenses and materials are not included and can be found at BIMdepot™, BIMcare™, BIMpilot™, or BIMphase™. BIMcare™ customers automatically receive a discount on this item.
Task - E&IC :
E | Measure Camera View
|
Task - Work Location:
Remote
The Electrical Engineer for Low-Voltage AC/DC Systems is responsible for the safe, compliant, and efficient installation, commissioning, and verification of smaller electrical systems up to 1000 V DC. This includes photovoltaic installations, DC strings, protection devices, energy storage systems, and all associated control and network infrastructures.
How does the climate-neutral Electrical Engineering Service operate?
A detailed assessment of all DC and AC components is performed to identify potential failure points and safety-relevant weaknesses. This includes inspection of PV strings, DC fuses, combiner boxes, cabling, grounding systems, inverters, and storage units. Based on this evaluation, targeted upgrades, reconfigurations, or replacements can be carried out to improve operational reliability and ensure compliance with electrical safety standards up to 1000 V DC.
Advanced monitoring technologies, including Victron control systems and IoT-based supervision, may be integrated to enable remote diagnostics and performance optimisation. This reduces maintenance time, increases system uptime, and improves long-term operational efficiency. Environmentally friendly and energy-efficient methods are consistently applied to support carbon-neutral operations.
What is the obligation to fully configure supply chains?
Ideally, this applies to a 4-day work week from Monday to Thursday. This is not an all-inclusive package; travel expenses and work materials are not included and can be found under BIMdepot™, BIMcare™, BIMpilot™, or BIMphase™. BIMcare™ clients automatically receive a discount.
Task - E&IC :
IC | Analyze cause of fault
|
Task - Work Location:
ZA - From George
Unknown fault in the control cabinet? We will create a diagnosis within 3 hours to solve the problem and get it fixed soon.
What are the advantages of a maintenance contract for digital controls?
After maintenance has been carried out as part of BIMcare™, we will reimburse 50% of the costs of a fault diagnosis, provided that the resulting repair offers are commissioned and BIMcare™ is then continued for at least 12 months without interruption.
Always configure supply chains completely
This is ideally suited for a 4-day work week, Monday through Thursday. This is not an all-inclusive package; travel expenses and materials are not included and can be found at BIMdepot™, BIMcare™, BIMpilot™, or BIMphase™. BIMcare™ customers automatically receive a discount on this item.
Item - Connection Length:
5m
|
Task - Work Location:
ZA - From George
The Coolenvi™ Electro Installation package offers professional installation of a 5 m power line including SPD, protection and connection. Delivery, installation, connection and commissioning completed in one working day from the Service Hub.
Scope of Services
Working time: 12 hours total team effort (2 technicians × 6 hours)
Travel: up to 30 km included
Material delivery: power line and protection components delivered curbside
Electromontage: routing and connection of the power line into the existing electrical distribution
Protection: installation of FI/LS and SPD devices
System check: electrical testing and functional inspection
Commissioning: handover in fully operational condition
This installation package provides a clear, professional solution for your electrical power line and protection, delivered by certified technicians.
Item - Connection Length:
10m
|
Task - Work Location:
ZA - From George
The Coolenvi™ Electro Installation package offers professional installation of a 10 m power line including SPD, protection and connection. Delivery, installation, connection and commissioning completed in one working day from the Service Hub.
Scope of Services
Working time: 16 hours total team effort (2 technicians × 8 hours)
Travel: up to 30 km included
Material delivery: power line and protection components delivered curbside
Electromontage: routing and connection of the power line into the existing electrical distribution
Protection: installation of FI/LS and SPD devices
System check: electrical testing and functional inspection
Commissioning: handover in fully operational condition
This installation package provides a clear, professional solution for your electrical power line and protection, delivered by certified technicians.
NOTE: Fixed-price packages may include delivery and/or installation by service technicians using special tools and specialized vehicles, as well as customer-specific assembled and pre-picked materials and service infrastructure. Personnel, materials, and resources are reserved exclusively. Cancellation after booking is not possible (§ 312g Abs. 2 BGB / EU Consumer Rights Directive 2011/83/EU). The installation date is scheduled once after booking and is only available within the specified season. This also applies if performance cannot be carried out for reasons attributable to the customer, including lack of cooperation or unavailability at the scheduled time.
Item - Connection Length:
15m
|
Task - Work Location:
ZA - From George
The Coolenvi™ Electro Installation package offers professional installation of a 15 m power line including SPD, protection and connection. Delivery, installation, connection and commissioning completed in one working day from the Service Hub.
Scope of Services
Working time: 18 hours total team effort (2 technicians × 9 hours)
Travel: up to 30 km included
Material delivery: power line and protection components delivered curbside
Electromontage: routing and connection of the power line into the existing electrical distribution
Protection: installation of FI/LS and SPD devices
System check: electrical testing and functional inspection
Commissioning: handover in fully operational condition
This installation package provides a clear, professional solution for your electrical power line and protection, delivered by certified technicians.
NOTE: Fixed-price packages may include delivery and/or installation by service technicians using special tools and specialized vehicles, as well as customer-specific assembled and pre-picked materials and service infrastructure. Personnel, materials, and resources are reserved exclusively. Cancellation after booking is not possible (§ 312g Abs. 2 BGB / EU Consumer Rights Directive 2011/83/EU). The installation date is scheduled once after booking and is only available within the specified season. This also applies if performance cannot be carried out for reasons attributable to the customer, including lack of cooperation or unavailability at the scheduled time.
Item - Connection Length:
20m
|
Task - Work Location:
ZA - From George
The Coolenvi™ Electro Installation package offers professional installation of a 20 m power line including SPD, protection and connection. Delivery, installation, connection and commissioning completed in one working day from the Service Hub.
Scope of Services
Working time: 22 hours total team effort (2 technicians × 11 hours)
Travel: up to 2x 30 km included
Material delivery: power line and protection components delivered curbside
Electromontage: routing and connection of the power line into the existing electrical distribution
Protection: installation of FI/LS and SPD devices
System check: electrical testing and functional inspection
Commissioning: handover in fully operational condition
This installation package provides a clear, professional solution for your electrical power line and protection, delivered by certified technicians.
NOTE: Fixed-price packages may include delivery and/or installation by service technicians using special tools and specialized vehicles, as well as customer-specific assembled and pre-picked materials and service infrastructure. Personnel, materials, and resources are reserved exclusively. Cancellation after booking is not possible (§ 312g Abs. 2 BGB / EU Consumer Rights Directive 2011/83/EU). The installation date is scheduled once after booking and is only available within the specified season. This also applies if performance cannot be carried out for reasons attributable to the customer, including lack of cooperation or unavailability at the scheduled time.
Item - Connection Length:
30m
|
Task - Work Location:
ZA - From George
The Coolenvi™ Electro Installation package offers professional installation of a 30 m power line including SPD, protection and connection. Delivery, installation, connection and commissioning completed in one working day from the Service Hub.
Scope of Services
Working time: 26 hours total team effort (2 technicians × 13 hours)
Travel: up to 2x 30 km included
Material delivery: power line and protection components delivered curbside
Electromontage: routing and connection of the power line into the existing electrical distribution
Protection: installation of FI/LS and SPD devices
System check: electrical testing and functional inspection
Commissioning: handover in fully operational condition
This installation package provides a clear, professional solution for your electrical power line and protection, delivered by certified technicians.
NOTE: Fixed-price packages may include delivery and/or installation by service technicians using special tools and specialized vehicles, as well as customer-specific assembled and pre-picked materials and service infrastructure. Personnel, materials, and resources are reserved exclusively. Cancellation after booking is not possible (§ 312g Abs. 2 BGB / EU Consumer Rights Directive 2011/83/EU). The installation date is scheduled once after booking and is only available within the specified season. This also applies if performance cannot be carried out for reasons attributable to the customer, including lack of cooperation or unavailability at the scheduled time.
Item - Connection Length:
50m
|
Task - Work Location:
ZA - From George
The Coolenvi™ Electro Installation package offers professional installation of a 50 m power line including SPD, protection and connection. Delivery, installation, connection and commissioning completed in one working day from the Service Hub.
Scope of Services
Working time: 32 hours total team effort (2 technicians × 16 hours)
Travel: up to 2x 30 km included
Material delivery: power line and protection components delivered curbside
Electromontage: routing and connection of the power line into the existing electrical distribution
Protection: installation of FI/LS and SPD devices
System check: electrical testing and functional inspection
Commissioning: handover in fully operational condition
This installation package provides a clear, professional solution for your electrical power line and protection, delivered by certified technicians.
NOTE: Fixed-price packages may include delivery and/or installation by service technicians using special tools and specialized vehicles, as well as customer-specific assembled and pre-picked materials and service infrastructure. Personnel, materials, and resources are reserved exclusively. Cancellation after booking is not possible (§ 312g Abs. 2 BGB / EU Consumer Rights Directive 2011/83/EU). The installation date is scheduled once after booking and is only available within the specified season. This also applies if performance cannot be carried out for reasons attributable to the customer, including lack of cooperation or unavailability at the scheduled time.
This installation package provides a structured and professional implementation of your Microgrid XS System, including photovoltaic generation, battery storage, and power conversion.
The system is delivered as a partially pre-assembled energy infrastructure unit, enabling reduced on-site installation time, improved system consistency, and repeatable deployment across projects. All works are carried out by certified personnel in accordance with applicable technical standards.
Installation Requirements
Client Responsibilities
The client is responsible for ensuring that all areas required for the installation of the microgrid system are fully accessible and suitable for installation works. Any delays, additional costs, or technical adjustments resulting from unmet site requirements or insufficient client-side preparation shall not be the responsibility of the contractor and may be subject to additional charges.
Provision of clear and adequate access to all installation areas (roof surfaces, technical areas, and external spaces)
Provision of basic site infrastructure, including electrical power supply, water, and sanitary facilities (toilet) for installation personnel
Verification and confirmation of the structural integrity and load-bearing capacity of all installation surfaces, in particular roof structures for photovoltaic systems and ground surfaces for system components, containers, and mounting structures
Ensuring sufficient load-bearing capacity and stability for scaffolding, lifting equipment, and other installation aids
Our Scope of Installation
Installation of 9 photovoltaic modules (approx. 2.1 m × 1.0 m each)
Installation of pre-assembled Microgrid XS Power Conversion Unit (PCU), including inverter, MPPT charge controller, protection devices, busbar system, and internal wiring
Installation and connection of LiFePO₄ battery system including DC busbar integration
DC cabling, string combiner integration, and system wiring
AC integration into existing electrical distribution (standard low-voltage connection, excluding modifications to main distribution board)
Installation and integration of 2-way smart meter (subject to local grid operator approval and regulatory requirements)
Scope of Services
Mechanical Installation: Roof mounting system, module installation, alignment, and structural fixing
Electrical Installation (DC & AC): Stringing, cabling, combiner integration, PCU connection, and protection devices
Energy System Integration: Inverter configuration, battery integration, and MPPT setup
Monitoring & Control: Smart meter integration and basic system monitoring configuration
Commissioning: Testing, parameterization, and documented handover in operational condition
Execution Model: Installation is performed within a defined execution window. Continuous on-site presence is not guaranteed and depends on project phase and workflow optimization
Installation Cost Breakdown
Position
Description
Price (€)
1. Mechanical Installation
6 days (2 technicians) – Roof mounting system, PV module installation, structural fixing and alignment
5,440 €
2. Electrical Installation (DC & AC)
3 days (2 technicians) – Internal system wiring, PCU integration, protection and grid connection
2,720 €
3. Energy System Commissioning
2 days (2 technicians) – Inverter setup, battery integration, MPPT configuration, smart meter, internal data network, monitoring setup
1,813 €
4. Logistics & Travel
Mobilization, travel costs (up to 300 km), accommodation, tools and consumables
1,470 €
5. Site Equipment
PPE provision; scaffolding included in system calculation
250 €
Total Installation Cost: 11,693 €
The above pricing is based on an estimated total installation effort of approximately 170–190 man-hours, calculated on the basis of a two-person installation team (8-hour workdays).
Additional Services (Not Included)
Modifications to existing electrical infrastructure (e.g. main distribution board, earthing upgrades)
Grid connection approval processes or utility coordination
Additional travel or extended mobilization beyond defined scope
Delays or additional work due to missing site readiness or access restrictions
Special construction works (core drilling, structural modifications, piping adjustments)
Integration into external systems (WiFi, KNX, advanced EMS)
Provision of heavy equipment (cranes, lifts beyond standard scope)
Construction and finishing works (masonry, painting, structural adaptations)
Right of Withdrawal (EU Consumers)
Consumers have the statutory right of withdrawal in accordance with applicable consumer protection laws.
Early Expiry of the Right of Withdrawal:
The right of withdrawal may expire prematurely if the customer expressly requests that the service begins before the end of the withdrawal period and acknowledges that the right of withdrawal is lost once the service has been fully performed.
Individually Configured Systems:
For system components that are individually configured, pre-assembled, or tailored to customer specifications, the right of withdrawal may be excluded where legally permitted.
Project Scheduling:
Installation dates are scheduled after order confirmation within a defined execution window. If performance cannot be carried out due to reasons attributable to the customer (e.g. lack of access or missing prerequisites), additional costs may apply.
This structured approach ensures a transparent, efficient, and technically compliant installation with clearly defined responsibilities and cost allocation.