Skip to main content

Coolenvi™ - Mounting SET 230 V Supply line and protection 1Phase

Product information "Coolenvi™ - Mounting SET 230 V Supply line and protection 1Phase"

This installation set includes a coordinated material package for the creation of electrical supply lines and protection. Suitable for air conditioning systems, split units, control cabinets or other technical systems with a single-phase 230-volt power supply. The installation SET has been configured for TT systems. A service socket for outdoor maintenance work is included in the set.

The set provides all essential installation components typically required for a standards-compliant electrical supply line and device protection. The installation itself is not part of this offer.


Installation set variants

Variant 1 – Basic installation

Material package for a standard installation of electrical supply lines including the necessary protection and maintenance switch.

Required space in the existing distribution board:

  • 5 module units for single-phase circuits (230 V)
  • 10 module units in mixed three-phase distribution boards (400 V)
  • Main terminal block with free outgoing capacity for L, N, PE

Material package contains up to 16A:

  • DE-HS1003 - Installation cable NYY 3x2.5qmm / electrical supply line
  • DE-UN1000 - H07VK flexible conductor cable black 4 qmm
  • DE-UN1100 - H07VK flexible conductor cable blue 4 qmm
  • DE-UN1200 - H07VK flexible conductor cable green-yellow 4 qmm
  • Various small materials for distribution without terminal block
  • DE-HAGMCB03KA1P16A - miniature circuit breaker 16A (MCB)

Material package contains for 20 to 25A:

  • DE-HS1004 - Installation cable NYY 3x4qmm / electrical supply line
  • DE-UN1001 - H07VK flexible conductor cable black 6 qmm
  • DE-UN1101 - H07VK flexible conductor cable blue 6 qmm
  • DE-UN1201 - H07VK flexible conductor cable green-yellow 6 qmm
  • Various small materials for distribution without terminal block
  • DE-HAGMCB06KA1P025A - miniature circuit breaker 25A (MCB)

Material package contains for 32A:

  • DE-HS1005 - Installation cable NYY 3x6qmm / electrical supply line
  • DE-UN1002 - H07VK flexible conductor cable black 10 qmm
  • DE-UN1102 - H07VK flexible conductor cable blue 10 qmm
  • DE-UN1202 - H07VK flexible conductor cable green-yellow 10 qmm
  • Various small materials for distribution without terminal block
  • DE-HAGMCB06KA1P032A - miniature circuit breaker 32A (MCB)

Material package contains for 40A:

  • DE-HS1006 - Installation cable NYY 3x10qmm / electrical supply line
  • DE-UN1003 - H07VK flexible conductor cable black 16 qmm
  • DE-UN1103 - H07VK flexible conductor cable blue 16 qmm
  • DE-UN1203 - H07VK flexible conductor cable green-yellow 16 qmm
  • Various small materials for distribution without terminal block
  • 0000 - miniature circuit breaker 40A (MCB)

Material package contains for 50A:

  • DE-HS1007 - Installation cable NYY 3x16qmm / electrical supply line
  • 0000 - H07VK flexible conductor cable black 25 qmm
  • 0000 - H07VK flexible conductor cable blue 25 qmm
  • 0000 - H07VK flexible conductor cable green-yellow 25 qmm
  • Various small materials for distribution without terminal block
  • 0000 - miniature circuit breaker 50A (MCB)

Material package contains for 63A:

  • 0000 - Installation cable NYY 3x25qmm / electrical supply line
  • 0000 - H07VK flexible conductor cable black 35 qmm
  • 0000 - H07VK flexible conductor cable green-yellow 35 qmm
  • 0000 - H07VK flexible conductor cable blue 35 qmm
  • Various small materials for distribution without terminal block
  • 0000 - miniature circuit breaker 63A (MCB)

Material package included in all variants:

  • DE-HAGMCB03KA1P16A - miniature circuit breaker 16A (MCB)
  • DE-HAGCD264J - residual current device (RCD)
  • DE-HAGKB263A - Bus Bar 1 pole
  • DK-KG32T20340KL51V - maintenance and repair switch for outdoor units
  • DE-MERT23018029 maintenance / service socket outdoor
  • DK-HAGVZ025M - cable glands
  • DE-WU097364040 - cable protection / cable routing channel with mounting material
  • DE-WU05021413.2 - cable ties fastening material


Variant 2 – Installation with 2-pole surge protection

Extended material package with additional protection against grid disturbances and voltage spikes.

Required space in the existing distribution board:

  • 7 module units for single-phase circuits (230 V) in three-phase distribution boards
  • 12 module units in mixed three-phase distribution boards (400 V)
  • Main terminal block with free outgoing capacity for L, N, PE

Material package additionally contains:

  • DE-DEHSPD014-900454 - surge protection (SPD) for network and device protection 2-pole
  • Installation components for integration of surge protection


Variant 3 – Installation with 4-pole surge protection

Extended material package with additional protection against grid disturbances and voltage spikes.

Typical space requirement in the existing distribution board:

  • 12 module units for single-phase circuits (230 V) in three-phase distribution boards
  • 12 module units in mixed three-phase distribution boards (400 V)
  • Main terminal block with free outgoing capacity for L1, L2, L3, N, PE

Material package additionally contains:

  • DE-DEHSPD016-952310 - surge protection (SPD) for network and device protection 4-pole
  • Installation components for integration of surge protection


Notes on space requirements and installation

  1. Before installing this installation set, it must be checked whether the existing distribution cabinet has sufficient space and capacity reserves for the required protection components. The specified module units (TE) serve as a guideline for estimating the required installation space. The installation set is designed for use in TN and TT systems; system-specific connection and installation requirements must be observed.

  2. If the available space or capacity reserve is insufficient, installation of a separate small distribution board or sub-distribution board may be required. This material is not included in this installation set.
  3. Installation of the included components may only be carried out by qualified electrical professionals in accordance with the applicable electrical safety requirements (5-rule safety principle).
  4. The scope of delivery does not include technical fire protection. If required, it must be planned, ordered and installed separately.


Typical applications

  • Control cabinets
  • Split air conditioning systems
  • Small heat pumps
  • Ventilation units
  • Technical systems with 230-volt supply

NOTE: The product image is not binding and does not represent a claim to the contents of the set. This item is manufactured according to your specifications. Therefore, you have no right of withdrawal and no Coolenvi return policy applies.

0 of 0 reviews

Average rating of 0 out of 5 stars

Leave a review!

Share your experiences with other customers.


🛠️ Let's Complete Your Installation

The product above includes only the materials. For installation and commissioning, add our BIMservice™ E&IC.

✔ One service – fully covered
✔ Tools, setup & mobility included

coolenvi-BIMservice-consulting-female-recommendation.png?ts=1764415523

Others also ordered

 BIMservice | E&IC Control Technician
BIMservice | E&IC Control Technician
Task - E&IC : IC | Replace Motor protection control | Task - Work Location: Remote
The Electric, Instrumentation, Controls Automation Technician is the solution for the well-regulated operation of building technologies. The economically effective. How our climate-neutral E&IC Technician works First, a comprehensive analysis of the potential causes of failure and the components involved would be required to identify possible vulnerabilities. Based on this, updates or upgrades to valves, pumps, and other relevant equipment could be considered to ensure more reliable performance. Integrating more advanced technology, perhaps incorporating IoT devices for remote monitoring and control, could also improve the effectiveness of the system. In this way, we minimize maintenance and repair times and increase operational efficiency. Additionally, we incorporate environmentally friendly practices to make operations more carbon neutral and realize long-term cost savings. Always fully configure supply chains This is ideally just for a 4-day week from Monday to Thursday. This is not an all-inclusive package, travel costs and work materials are not included and can be found under BIMdepot™, BIMcare™, BIMpilot™, or BIMphase™. BIMcare™ customers automatically receive a discount on this item.

€145.00*
 BIMservice | Electrical Technician
BIMservice | Electrical Technician
Task - E&IC : E | Measure Camera View | Task - Work Location: DK - From Ribe
The Electrical Engineer for Low-Voltage AC/DC Systems is responsible for the safe, compliant, and efficient installation, commissioning, and verification of smaller electrical systems up to 1000 V DC. This includes photovoltaic systems, DC strings, protection devices, energy storage systems, and all associated control and network infrastructures. How does the climate-neutral Electrical Engineering Service work? First, a detailed assessment of all DC and AC components is performed to identify potential failure points and safety-relevant weaknesses. This includes examining PV strings, DC fuses, combiner boxes, cabling, grounding systems, inverters, and energy storage units. Based on this analysis, targeted upgrades, reconfiguration, or replacement of components may be implemented to improve operational reliability and ensure compliance with electrical safety standards up to 1000 V DC. Furthermore, modern monitoring technologies, including Victron control systems and IoT-based supervision, can be integrated to enable remote diagnostics and performance optimization. In this way, maintenance times are reduced, system uptime is increased, and long-term operational efficiency is achieved. Environmentally friendly and energy-efficient approaches are consistently applied to support carbon-neutral operations. What is obligation to fully configure supply chains? This is ideally just for a 4-day week from Monday to Thursday. This is not an all-inclusive package, travel costs and work materials are not included and can be found under BIMdepot™, BIMcare™, BIMpilot™, or BIMphase™. BIMcare™ customers automatically receive a discount on this item.

€145.00*
BIMaudit | MEP Appraiser - Damage Assessment
BIMaudit | MEP Appraiser - Damage Assessment
1. BIMaudit - Area: Ventilation technology | 2. BIMaudit - Concern: Water damage, burst pipes | 3. BIMaudit - Purpose: Legal dispute / preservation of evidence | 4. BIMaudit - Content: Cause of Damage & Condition Assessment Scope documented in detail | Language Version: German | Task - Work Location: Remote
Do you have damage to your building's technology? Whether it's water damage, a heating failure, or a dispute – here you can receive a customised report from an independent building services expert. 1. What is being assessed? Ventilation technology Air conditioning technology Fire protection (dampers, concept, smoke protection) Gas or heat pump heating Refrigeration technology Plumbing technology (drinking water) Electrical engineering (low voltage, meter cabinet) Building automation (switch cabinet) Construction contracts & Building Acceptance ️2. Where did damage occur? 💧 Water damage, burst pipes 🔥 Fire damage, short circuit, power surge 🌫️ Mold, indoor air or odors 🧱 Construction defects or construction delays 📉 Loss of value / building damage 🌪️ Natural event (storm, hail, lightning, flood)> 3. What do you need the appraisal for? ⚖️ Legal dispute / preservation of evidence 🕊️ Mediation or out-of-court settlement 🧾 Review of a construction contract 💰 Submission to insurance / claims settlement 4. Which services are required? Cause of Damage & Condition Assessment Scope documented in detail Estimation of renovation costs Repair recommendations BIMaudit™ Process ✔️ You submit documents, photos, and data digitally. ✔️ The appraiser reviews and prepares an individual report. ✔️ Optional: Additional services such as BIM management can be booked. Always fully configure supply chains The service is provided remotely (no on-site appointments included). Costs for travel, materials, or additional reviews can be booked separately under BIMdepot™, BIMservice™, or BIM-Management. Processing takes place within a 4-day week (Monday–Thursday).

€1,160.00*
Tip
BIMservice | Fault Diagnose Control Technology
BIMservice | Fault Diagnose Control Technology
Task - E&IC : IC | Analyze cause of fault | Task - Work Location: Remote
Unknown fault in the control cabinet? We will create a diagnosis within 3 hours to solve the problem. The advantage of a maintenance contract After maintenance has been carried out as part of "BIM-Care", we will reimburse 50% of the costs of a fault diagnosis, provided that the resulting repair offers are commissioned and BIM-Care is then continued for at least 12 months without interruption. Always configure supply chains completely It is best to work 4 days a week from Monday to Thursday. This is not an all-inclusive service, travel costs and work equipment are not included and these can be found under BIMpilot or BIMservice.

Content: 3 Hour/s (€145.00* / 1 Hour/s)

€435.00*
Tip
BIMservice | Technical Advice
BIMservice | Technical Advice
Task - Work Location: Remote
Measurement, optimization or consulting? We offer this service on-site or remotely for one hour, tailored to your specific needs. What are the advantages of a BIMcare™ maintenance contract? After maintenance is performed under BIMcare™, we will reimburse 50% of the cost of a fault diagnosis, provided that the resulting repair quotes are commissioned and BIMcare™ is subsequently continued continuously for at least 12 months. Even without BIMcare™, a cost-effective remote service is available via WhatsApp. Always configure supply chains completely This is ideally suited for a 4-day work week, Monday through Thursday. This is not an all-inclusive package; travel expenses and materials are not included and can be found at BIMdepot™, BIMcare™, BIMpilot™, or BIMphase™. BIMcare™ customers automatically receive a discount on this item.

€145.00*
Tip
Coolenvi™ Electro Installation – 10 m Power Line – 1AT | 16h | 30 km
Coolenvi™ Electro Installation – 10 m Power Line – 1AT | 16h | 30 km
Item - Connection Length: 10m | Task - Work Location: DK - From Ribe
The Coolenvi™ Electro Installation package offers professional installation of a 10 m power line including SPD, protection and connection. Delivery, installation, connection and commissioning completed in one working day from the Service Hub. Scope of Services Working time: 16 hours total team effort (2 technicians × 8 hours) Travel: up to 30 km included Material delivery: power line and protection components delivered curbside Electromontage: routing and connection of the power line into the existing electrical distribution Protection: installation of FI/LS and SPD devices System check: electrical testing and functional inspection Commissioning: handover in fully operational condition This installation package provides a clear, professional solution for your electrical power line and protection, delivered by certified technicians. NOTE: Fixed-price packages may include delivery and/or installation by service technicians using special tools and specialized vehicles, as well as customer-specific assembled and pre-picked materials and service infrastructure. Personnel, materials, and resources are reserved exclusively. Cancellation after booking is not possible (§ 312g Abs. 2 BGB / EU Consumer Rights Directive 2011/83/EU). The installation date is scheduled once after booking and is only available within the specified season. This also applies if performance cannot be carried out for reasons attributable to the customer, including lack of cooperation or unavailability at the scheduled time.

€1,951.00*
Tip
Coolenvi™ Electro Installation – 15 m Power Line – 1AT | 18h | 30 km
Coolenvi™ Electro Installation – 15 m Power Line – 1AT | 18h | 30 km
Item - Connection Length: 15m | Task - Work Location: DK - From Ribe
The Coolenvi™ Electro Installation package offers professional installation of a 15 m power line including SPD, protection and connection. Delivery, installation, connection and commissioning completed in one working day from the Service Hub. Scope of Services Working time: 18 hours total team effort (2 technicians × 9 hours) Travel: up to 30 km included Material delivery: power line and protection components delivered curbside Electromontage: routing and connection of the power line into the existing electrical distribution Protection: installation of FI/LS and SPD devices System check: electrical testing and functional inspection Commissioning: handover in fully operational condition This installation package provides a clear, professional solution for your electrical power line and protection, delivered by certified technicians. NOTE: Fixed-price packages may include delivery and/or installation by service technicians using special tools and specialized vehicles, as well as customer-specific assembled and pre-picked materials and service infrastructure. Personnel, materials, and resources are reserved exclusively. Cancellation after booking is not possible (§ 312g Abs. 2 BGB / EU Consumer Rights Directive 2011/83/EU). The installation date is scheduled once after booking and is only available within the specified season. This also applies if performance cannot be carried out for reasons attributable to the customer, including lack of cooperation or unavailability at the scheduled time.

€2,181.00*
Tip
Coolenvi™ Electro Installation – 20 m Power Line – 2AT | 22h | 60 km
Coolenvi™ Electro Installation – 20 m Power Line – 2AT | 22h | 60 km
Item - Connection Length: 20m | Task - Work Location: DK - From Ribe
The Coolenvi™ Electro Installation package offers professional installation of a 20 m power line including SPD, protection and connection. Delivery, installation, connection and commissioning completed in one working day from the Service Hub. Scope of Services Working time: 22 hours total team effort (2 technicians × 11 hours) Travel: up to 2x 30 km included Material delivery: power line and protection components delivered curbside Electromontage: routing and connection of the power line into the existing electrical distribution Protection: installation of FI/LS and SPD devices System check: electrical testing and functional inspection Commissioning: handover in fully operational condition This installation package provides a clear, professional solution for your electrical power line and protection, delivered by certified technicians. NOTE: Fixed-price packages may include delivery and/or installation by service technicians using special tools and specialized vehicles, as well as customer-specific assembled and pre-picked materials and service infrastructure. Personnel, materials, and resources are reserved exclusively. Cancellation after booking is not possible (§ 312g Abs. 2 BGB / EU Consumer Rights Directive 2011/83/EU). The installation date is scheduled once after booking and is only available within the specified season. This also applies if performance cannot be carried out for reasons attributable to the customer, including lack of cooperation or unavailability at the scheduled time.

€2,752.00*
Tip
Coolenvi™ Electro Installation – 30 m Power Line – 2AT | 26h | 60 km
Coolenvi™ Electro Installation – 30 m Power Line – 2AT | 26h | 60 km
Item - Connection Length: 30m | Task - Work Location: DK - From Ribe
The Coolenvi™ Electro Installation package offers professional installation of a 30 m power line, including SPD, protection and connection. Delivery, installation, connection and commissioning completed in one working day from the Service Hub. Scope of Services Working time: 26 hours total team effort (2 technicians × 13 hours) Travel: up to 2x 30 km included Material delivery: power line and protection components delivered curbside Electromontage: routing and connection of the power line into the existing electrical distribution Protection: installation of FI/LS and SPD devices System check: electrical testing and functional inspection Commissioning: handover in fully operational condition This installation package provides a clear, professional solution for your electrical power line and protection, delivered by certified technicians. NOTE: Fixed-price packages may include delivery and/or installation by service technicians using special tools and specialized vehicles, as well as customer-specific assembled and pre-picked materials and service infrastructure. Personnel, materials, and resources are reserved exclusively. Cancellation after booking is not possible (§ 312g Abs. 2 BGB / EU Consumer Rights Directive 2011/83/EU). The installation date is scheduled once after booking and is only available within the specified season. This also applies if performance cannot be carried out for reasons attributable to the customer, including lack of cooperation or unavailability at the scheduled time.

€3,212.00*
Tip
Coolenvi™ Electro Installation – 5 m Power Line – 1AT | 12h | 30 km
Coolenvi™ Electro Installation – 5 m Power Line – 1AT | 12h | 30 km
Item - Connection Length: 5m | Task - Work Location: DK - From Ribe
The Coolenvi™ Electro Installation package offers professional installation of a 5 m power line including SPD, protection and connection. Delivery, installation, connection and commissioning completed in one working day from the Service Hub. Scope of Services Working time: 12 hours total team effort (2 technicians × 6 hours) Travel: up to 30 km included Material delivery: power line and protection components delivered curbside Electromontage: routing and connection of the power line into the existing electrical distribution Protection: installation of FI/LS and SPD devices System check: electrical testing and functional inspection Commissioning: handover in fully operational condition This installation package provides a clear, professional solution for your electrical power line and protection, delivered by certified technicians. NOTE: Fixed-price packages may include delivery and/or installation by service technicians using special tools and specialized vehicles, as well as customer-specific assembled and pre-picked materials and service infrastructure. Personnel, materials, and resources are reserved exclusively. Cancellation after booking is not possible (§ 312g Abs. 2 BGB / EU Consumer Rights Directive 2011/83/EU). The installation date is scheduled once after booking and is only available within the specified season. This also applies if performance cannot be carried out for reasons attributable to the customer, including lack of cooperation or unavailability at the scheduled time.

€1,491.00*
Tip
Coolenvi™ Electro Installation – 50 m Power Line – 2AT | 32h | 60 km
Coolenvi™ Electro Installation – 50 m Power Line – 2AT | 32h | 60 km
Item - Connection Length: 50m | Task - Work Location: DK - From Ribe
The Coolenvi™ Electro Installation package offers professional installation of a 50 m power line, including SPD, protection and connection. Delivery, installation, connection and commissioning completed in one working day from the Service Hub. Scope of Services Working time: 32 hours total team effort (2 technicians × 16 hours) Travel: up to 2x 30 km included Material delivery: power line and protection components delivered curbside Electromontage: routing and connection of the power line into the existing electrical distribution Protection: installation of FI/LS and SPD devices System check: electrical testing and functional inspection Commissioning: handover in fully operational condition This installation package provides a clear, professional solution for your electrical power line and protection, delivered by certified technicians. NOTE: Fixed-price packages may include delivery and/or installation by service technicians using special tools and specialized vehicles, as well as customer-specific assembled and pre-picked materials and service infrastructure. Personnel, materials, and resources are reserved exclusively. Cancellation after booking is not possible (§ 312g Abs. 2 BGB / EU Consumer Rights Directive 2011/83/EU). The installation date is scheduled once after booking and is only available within the specified season. This also applies if performance cannot be carried out for reasons attributable to the customer, including lack of cooperation or unavailability at the scheduled time.

€3,902.00*
Tip
New
Coolenvi™ MICROGRID XS Installation – 11 AT | 176 h | 300 km
Coolenvi™ MICROGRID XS Installation – 11 AT | 176 h | 300 km
Task - Work Location: DK - From Ribe
This installation package provides a structured and professional implementation of your Microgrid XS System, including photovoltaic generation, battery storage, and power conversion. The system is delivered as a partially pre-assembled energy infrastructure unit, enabling reduced on-site installation time, improved system consistency, and repeatable deployment across projects. All works are carried out by certified personnel in accordance with applicable technical standards. Installation Requirements Client Responsibilities The client is responsible for ensuring that all areas required for the installation of the microgrid system are fully accessible and suitable for installation works. Any delays, additional costs, or technical adjustments resulting from unmet site requirements or insufficient client-side preparation shall not be the responsibility of the contractor and may be subject to additional charges. Provision of clear and adequate access to all installation areas (roof surfaces, technical areas, and external spaces) Provision of basic site infrastructure, including electrical power supply, water, and sanitary facilities (toilet) for installation personnel Verification and confirmation of the structural integrity and load-bearing capacity of all installation surfaces, in particular roof structures for photovoltaic systems and ground surfaces for system components, containers, and mounting structures Ensuring sufficient load-bearing capacity and stability for scaffolding, lifting equipment, and other installation aids Our Scope of Installation Installation of 9 photovoltaic modules (approx. 2.1 m × 1.0 m each) Installation of pre-assembled Microgrid XS Power Conversion Unit (PCU), including inverter, MPPT charge controller, protection devices, busbar system, and internal wiring Installation and connection of LiFePO₄ battery system including DC busbar integration DC cabling, string combiner integration, and system wiring AC integration into existing electrical distribution (standard low-voltage connection, excluding modifications to main distribution board) Installation and integration of 2-way smart meter (subject to local grid operator approval and regulatory requirements) Scope of Services Mechanical Installation: Roof mounting system, module installation, alignment, and structural fixing Electrical Installation (DC & AC): Stringing, cabling, combiner integration, PCU connection, and protection devices Energy System Integration: Inverter configuration, battery integration, and MPPT setup Monitoring & Control: Smart meter integration and basic system monitoring configuration Commissioning: Testing, parameterization, and documented handover in operational condition Execution Model: Installation is performed within a defined execution window. Continuous on-site presence is not guaranteed and depends on project phase and workflow optimization Installation Cost Breakdown Position Description Price (€) 1. Mechanical Installation 6 days (2 technicians) – Roof mounting system, PV module installation, structural fixing and alignment 5,440 € 2. Electrical Installation (DC & AC) 3 days (2 technicians) – Internal system wiring, PCU integration, protection and grid connection 2,720 € 3. Energy System Commissioning 2 days (2 technicians) – Inverter setup, battery integration, MPPT configuration, smart meter, internal data network, monitoring setup 1,813 € 4. Logistics & Travel Mobilization, travel costs (up to 300 km), accommodation, tools and consumables 1,470 € 5. Site Equipment PPE provision; scaffolding included in system calculation 250 € Total Installation Cost: 11,693 € The above pricing is based on an estimated total installation effort of approximately 170–190 man-hours, calculated on the basis of a two-person installation team (8-hour workdays). Additional Services (Not Included) Modifications to existing electrical infrastructure (e.g. main distribution board, earthing upgrades) Grid connection approval processes or utility coordination Additional travel or extended mobilization beyond defined scope Delays or additional work due to missing site readiness or access restrictions Special construction works (core drilling, structural modifications, piping adjustments) Integration into external systems (WiFi, KNX, advanced EMS) Provision of heavy equipment (cranes, lifts beyond standard scope) Construction and finishing works (masonry, painting, structural adaptations) Right of Withdrawal (EU Consumers) Consumers have the statutory right of withdrawal in accordance with applicable consumer protection laws. Early Expiry of the Right of Withdrawal: The right of withdrawal may expire prematurely if the customer expressly requests that the service begins before the end of the withdrawal period and acknowledges that the right of withdrawal is lost once the service has been fully performed. Individually Configured Systems: For system components that are individually configured, pre-assembled, or tailored to customer specifications, the right of withdrawal may be excluded where legally permitted. Project Scheduling: Installation dates are scheduled after order confirmation within a defined execution window. If performance cannot be carried out due to reasons attributable to the customer (e.g. lack of access or missing prerequisites), additional costs may apply. This structured approach ensures a transparent, efficient, and technically compliant installation with clearly defined responsibilities and cost allocation.

€11,693.00*