Product information "Coolenvi™ RPIV Redundant Ceiling-Mounted Cooling System – 6.3 kW Sensitive IT & Process Cooling"
2 Ceiling-mounted air conditioner RPIV 100UD for high sensible performance and maximum efficiency.
This versatile unit delivers excellent air distribution, high energy efficiency and outstanding sensible cooling capacity.
It is ideal for technical rooms, commercial environments and areas with increased cooling demand.
Special unit combinations allow up to 100% sensible cooling capacity.
Key Features
Optional free cooling capability
SEER up to 6.4
Energy efficiency class up to A++
Very high sensible capacity up to 90% of nominal cooling output
Automatic restart after power failure
Cooling operation down to 14°C setpoint
2+1 redundancy function with wired controller
Smart defrost function
Operating range from -15 to +46°C outdoor temperature
Design
Modern pure white housing
Ultra-compact height of only 23 cm
Air Quality
Durable standard filter
Fresh air connection for free cooling
Optional filter against pollutants and odours
Airflow Control
Automatic fan speed control
4 fan speed levels
High-ceiling mode for rooms up to 4.2 m
Optimised airflow for low ceiling heights
Installation & Maintenance
Simple and fast installation
Easy access for servicing
PIV - Consumption kW:
1.775
PIV - Energy Class:
A++ cool / A++ heat
PIV - Height Difference (max.) m:
30
PIV - Pipe Length (min.-max.) m:
3 - 55
PIV - Refrigerant (GWP):
R32 (675)
PIV - Sensitive Cooling Capacity kW:
5.24 (SHR 0.86)
PIV - Nominal Cooling Capacity kW:
7.10 / 3.80 - 8.10 min.-max.
PIV - Nominal Heating Capacity kW:
7.10
PIV - Power Supply V/Ph/Hz:
220-240/1/50
PIV - Sound pressure level dB(A):
I 37/39/41/43 - O 49
PIV - Pipe dimension mm (inch) / m:
9.5 (3/8) - 15.9 (5/8) / 3 - 50
PIV - IU Dimensions (HxWxD) mm:
230 x 1600 x 680 - UD
PIV - OU Dimensions (HxWxD) mm:
943 x 950 x 355 - 71
PIV - Room Size m² - (kW | BTU):
60 - (6.0 | 20.500)
PIV - Weight IU/OU kg:
37 / 67
0 of 0 reviews
Average rating of 0 out of 5 stars
Leave a review!
Share your experiences with other customers.
Login
No reviews found. Share your insights with others.
Commissioning package for air conditioning systems purchased from Coolenvi
This commissioning package is exclusively intended for air conditioning systems purchased from Coolenvi. It includes the service of a technician from our service centre to carry out the commissioning in accordance with the following scope of services. The package includes one delivery trip including return journey for delivery of the equipment to the kerbside, as well as a separate round trip on the following day for commissioning. The installation of the air conditioning system must be carried out by a licensed specialist company appointed by you and documented accordingly, which also assumes responsibility for the installation warranty. Without this documentation, we cannot deliver the air conditioning system or carry out the commissioning. In this case, we reserve the right to postpone the delivery and store the equipment subject to a storage fee of 10% of the equipment purchase price.
Scope of the commissioning package together with new Coolenvi air conditioning systems
Technician service: 1 technician for a total duration of up to 2 hours
Delivery of air conditioning systems: Up to 100 km one-way distance included
Travel for commissioning: On the following day up to 100 km one-way distance included
Accommodation: Included from the delivery day until the following day, if required once
Unloading and handover: Delivery of the air conditioning systems to the kerbside; transport into the building is carried out by the documented licensed specialist company.
Commissioning: Connection or visual inspection of the prepared refrigerant pipes with ready-to-connect flare connections. Connection of electrical cables between indoor and outdoor units as well as from the service switch. Afterwards, leak testing, evacuation of the system and final functional testing are carried out in accordance with applicable regulations. These tasks are carried out exclusively by our technician.
Note: This package is part of our complete service for air conditioning systems purchased from Coolenvi. For systems purchased from other suppliers, different requirements apply and additional costs for travel, inspections and additional services may arise.
Have you not purchased your air conditioning system from Coolenvi?
We can also commission air conditioning systems that were not purchased from Coolenvi. The following requirements must be met:
the air conditioning system must be fully installed,
the installation must comply with the manufacturer's specifications,
the installation must have been carried out by a licensed specialist company,
photos of the installation, rating plates and system data must be provided for review.
Before scheduling an appointment, we check the installation based on your documents, photos and – if required – additional technical information. For systems purchased from other suppliers, travel costs as well as any additional inspection or labour requirements must be booked separately in advance.
If the specialist company commissioned by you refuses the installation at short notice or if no suitable specialist company is available, we can carry out the installation by prior agreement for an additional charge. This service is voluntary, does not include any warranty, is not part of the commissioning package and must be ordered separately.
Additional services for the commissioning package
(Optional, subject to additional charges)
Additional electrical work (e.g. service switch, residual current device, circuit breakers)
Travel to and from systems purchased from other suppliers as well as journeys exceeding 100 km one-way distance
Accommodation surcharges for longer distances or multi-day assignments
Additional work (e.g. modifications, installation work or a renewed commissioning appointment)
Connection or integration with WLAN or KNX
Provision of scaffolding from 2 m working height, personal protective equipment (PPE) or lifting platforms
Provision of personnel for material transport
Additional required materials and spare parts
Returns and right of withdrawal
As the supplied air conditioning systems are individually configured products, returns or refunds are excluded in accordance with the applicable legal provisions. If the required documentation from a licensed specialist company is not provided, delivery will be suspended until the documentation is submitted or the equipment will be stored at the customer's request subject to additional charges. Commissioning will only be carried out after successful verification of the installation and compliance with applicable safety and manufacturer requirements. We reserve the right to refuse commissioning if safety defects, violations of manufacturer specifications or applicable regulations are identified.
Customers are required to provide proof of a licensed specialist company before delivery or commissioning. Delivery and subsequent commissioning by our technician will only take place after successful verification.
Commissioning is carried out exclusively by our technician in accordance with the German Chemicals Climate Protection Ordinance (ChemKlimaschutzV) and Regulation (EU) 2024/573. The actual installation and assembly of the air conditioning system remain the responsibility of the licensed specialist company appointed by you.
The installation package includes the deployment of a two-person service team for a full working day, as well as a single round trip from our service hub. It provides a clearly defined, professional solution for the installation of your air conditioning system. Delivery | Setup | Commissioning | Handover
Scope of Services
Working time: Total 12 hours of team effort (2 technicians)
Travel: up to 30 km (one way)
Material delivery: ordered units, components, installation sets delivered curbside
Installation: indoor and outdoor units including piping
System check: pressure test, vacuum, leak test, and functional run
Commissioning: complete documented handover in operational condition
Instruction: operation, basic functions, and maintenance guidance
Additional services to be ordered separately
Electrical connection (fuse connection, RCD/MCB, repair switch)
Additional kilometers beyond 30 km
Overnight costs for longer distances or multi-day assignments
Special work (core drilling, wall penetrations, pipe adjustments)
Condensate pump, funnel siphon, or connection to existing lines
Connection or integration with Wifi or KNX
Provision of scaffolding from 2 m working height, crane transport, lifts
Provision of special tools and equipment for dismantling
Construction and follow-up work: masonry, painting, roofing, and similar trades
This ensures a structured, efficient, and professional installation with a clearly defined scope of services. Installation is carried out according to ChemKlimaschutzV, EU 573/2024 and only by certified personnel or HVAC specialists.
NOTE: Fixed-price packages may include delivery and/or installation by service technicians using special tools and specialized vehicles, as well as customer-specific assembled and pre-picked materials and service infrastructure. Personnel, materials, and resources are reserved exclusively. Cancellation after booking is not possible (§ 312g Abs. 2 BGB / EU Consumer Rights Directive 2011/83/EU). The installation date is scheduled once after booking and is only available within the specified season. This also applies if performance cannot be carried out for reasons attributable to the customer, including lack of cooperation or unavailability at the scheduled time.
The installation package includes the deployment of a two-person service team for a full working day, as well as a single round trip from our service hub. It provides a clearly defined, professional solution for the installation of your air conditioning system. Delivery | Setup | Commissioning | Handover
Scope of Services
Working time: Total 14 hours of team effort (2 technicians)
Travel: up to 30 km (one way)
Material delivery: ordered units, components, installation sets delivered curbside
Installation: indoor and outdoor units including piping
System check: pressure test, vacuum, leak test, and functional run
Commissioning: complete documented handover in operational condition
Instruction: operation, basic functions, and maintenance guidance
Additional services to be ordered separately
Electrical connection (fuse connection, RCD/MCB, repair switch)
Additional kilometers beyond 30 km
Overnight costs for longer distances or multi-day assignments
Special work (core drilling, wall penetrations, pipe adjustments)
Condensate pump, funnel siphon, or connection to existing lines
Connection or integration with Wifi or KNX
Provision of scaffolding from 2 m working height, crane transport, lifts
Provision of special tools and equipment for dismantling
Construction and follow-up work: masonry, painting, roofing, and similar trades
This ensures a structured, efficient, and professional installation with a clearly defined scope of services. Installation is carried out according to ChemKlimaschutzV, EU 573/2024 and only by certified personnel or HVAC specialists.
NOTE: Fixed-price packages may include delivery and/or installation by service technicians using special tools and specialized vehicles, as well as customer-specific assembled and pre-picked materials and service infrastructure. Personnel, materials, and resources are reserved exclusively. Cancellation after booking is not possible (§ 312g Abs. 2 BGB / EU Consumer Rights Directive 2011/83/EU). The installation date is scheduled once after booking and is only available within the specified season. This also applies if performance cannot be carried out for reasons attributable to the customer, including lack of cooperation or unavailability at the scheduled time.
The installation package includes the deployment of a two-person service team for a full working day, as well as a single round trip from our service hub. It provides a clearly defined, professional solution for the installation of your air conditioning system. Delivery | Setup | Commissioning | Handover
Scope of Services
Working time: Total 16 hours of team effort (2 technicians)
Travel: up to 30 km (one way)
Material delivery: ordered units, components, installation sets delivered curbside
Installation: indoor and outdoor units including piping
System check: pressure test, vacuum, leak test, and functional run
Commissioning: complete documented handover in operational condition
Instruction: operation, basic functions, and maintenance guidance
Additional services to be ordered separately
Electrical connection (fuse connection, RCD/MCB, repair switch)
Additional kilometers beyond 30 km
Overnight costs for longer distances or multi-day assignments
Special work (core drilling, wall penetrations, pipe adjustments)
Condensate pump, funnel siphon, or connection to existing lines
Connection or integration with Wifi or KNX
Provision of scaffolding from 2 m working height, crane transport, lifts
Provision of special tools and equipment for dismantling
Construction and follow-up work: masonry, painting, roofing, and similar trades
This ensures a structured, efficient, and professional installation with a clearly defined scope of services. Installation is carried out according to ChemKlimaschutzV, EU 573/2024 and only by certified personnel or HVAC specialists.
NOTE: Fixed-price packages may include delivery and/or installation by service technicians using special tools and specialized vehicles, as well as customer-specific assembled and pre-picked materials and service infrastructure. Personnel, materials, and resources are reserved exclusively. Cancellation after booking is not possible (§ 312g Abs. 2 BGB / EU Consumer Rights Directive 2011/83/EU). The installation date is scheduled once after booking and is only available within the specified season. This also applies if performance cannot be carried out for reasons attributable to the customer, including lack of cooperation or unavailability at the scheduled time.
The installation package includes the deployment of a two-person service team for a full working day, as well as a single round trip from our service hub. It provides a clearly defined, professional solution for the installation of your air conditioning system. Delivery | Setup | Commissioning | Handover
Scope of Services
Working time: Total 16 hours of team effort (2 technicians)
Travel: up to 60 km (one way)
Material delivery: ordered units, components, installation sets delivered curbside
Installation: indoor and outdoor units including piping
System check: pressure test, vacuum, leak test, and functional run
Commissioning: complete documented handover in operational condition
Instruction: operation, basic functions, and maintenance guidance
Additional services to be ordered separately
Electrical connection (fuse connection, RCD/MCB, repair switch)
Additional kilometers beyond 60 km
Overnight costs for longer distances or multi-day assignments
Special work (core drilling, wall penetrations, pipe adjustments)
Condensate pump, funnel siphon, or connection to existing lines
Connection or integration with Wifi or KNX
Provision of scaffolding from 2 m working height, crane transport, lifts
Provision of special tools and equipment for dismantling
Construction and follow-up work: masonry, painting, roofing, and similar trades
This ensures a structured, efficient, and professional installation with a clearly defined scope of services. Installation is carried out according to ChemKlimaschutzV, EU 573/2024 and only by certified personnel or HVAC specialists.
NOTE: Fixed-price packages may include delivery and/or installation by service technicians using special tools and specialized vehicles, as well as customer-specific assembled and pre-picked materials and service infrastructure. Personnel, materials, and resources are reserved exclusively. Cancellation after booking is not possible (§ 312g Abs. 2 BGB / EU Consumer Rights Directive 2011/83/EU). The installation date is scheduled once after booking and is only available within the specified season. This also applies if performance cannot be carried out for reasons attributable to the customer, including lack of cooperation or unavailability at the scheduled time.
The installation package includes the deployment of a two-person service team for a full working day, as well as a single round trip from our service hub. It provides a clearly defined, professional solution for the installation of your air conditioning system. Delivery | Setup | Commissioning | Handover
Scope of Services
Working time: Total 20 hours of team effort (2 technicians)
Travel: up to 100 km (one way)
Material delivery: ordered units, components, installation sets delivered curbside
Installation: indoor and outdoor units including piping
System check: pressure test, vacuum, leak test, and functional run
Commissioning: complete documented handover in operational condition
Instruction: operation, basic functions, and maintenance guidance
Additional services to be ordered separately
Electrical connection (fuse connection, RCD/MCB, repair switch)
Additional kilometers beyond 100 km
Overnight costs for longer distances or multi-day assignments
Special work (core drilling, wall penetrations, pipe adjustments)
Condensate pump, funnel siphon, or connection to existing lines
Connection or integration with Wifi or KNX
Provision of scaffolding from 2 m working height, crane transport, lifts
Provision of special tools and equipment for dismantling
Construction and follow-up work: masonry, painting, roofing, and similar trades
This ensures a structured, efficient, and professional installation with a clearly defined scope of services. Installation is carried out according to ChemKlimaschutzV, EU 573/2024 and only by certified personnel or HVAC specialists.
NOTE: Fixed-price packages may include delivery and/or installation by service technicians using special tools and specialized vehicles, as well as customer-specific assembled and pre-picked materials and service infrastructure. Personnel, materials, and resources are reserved exclusively. Cancellation after booking is not possible (§ 312g Abs. 2 BGB / EU Consumer Rights Directive 2011/83/EU). The installation date is scheduled once after booking and is only available within the specified season. This also applies if performance cannot be carried out for reasons attributable to the customer, including lack of cooperation or unavailability at the scheduled time.
The installation package includes the deployment of a two-person service team for a full working day, as well as a single round trip from our service hub. It provides a clearly defined, professional solution for the installation of your air conditioning system. Delivery | Setup | Commissioning | Handover
Scope of Services
Working time: Total 20 hours of team effort (2 technicians)
Travel: up to 150 km (one way)
Material delivery: ordered units, components, installation sets delivered curbside
Installation: indoor and outdoor units including piping
System check: pressure test, vacuum, leak test, and functional run
Commissioning: complete documented handover in operational condition
Instruction: operation, basic functions, and maintenance guidance
Additional services to be ordered separately
Electrical connection (fuse connection, RCD/MCB, repair switch)
Additional kilometers beyond 150 km
Overnight costs for longer distances or multi-day assignments
Special work (core drilling, wall penetrations, pipe adjustments)
Condensate pump, funnel siphon, or connection to existing lines
Connection or integration with Wifi or KNX
Provision of scaffolding from 2 m working height, crane transport, lifts
Provision of special tools and equipment for dismantling
Construction and follow-up work: masonry, painting, roofing, and similar trades
This ensures a structured, efficient, and professional installation with a clearly defined scope of services. Installation is carried out according to ChemKlimaschutzV, EU 573/2024 and only by certified personnel or HVAC specialists.
NOTE: Fixed-price packages may include delivery and/or installation by service technicians using special tools and specialized vehicles, as well as customer-specific assembled and pre-picked materials and service infrastructure. Personnel, materials, and resources are reserved exclusively. Cancellation after booking is not possible (§ 312g Abs. 2 BGB / EU Consumer Rights Directive 2011/83/EU). The installation date is scheduled once after booking and is only available within the specified season. This also applies if performance cannot be carried out for reasons attributable to the customer, including lack of cooperation or unavailability at the scheduled time.
The installation package includes the deployment of a two-person service team for a full working day, as well as a single round trip from our service hub. It provides a clearly defined, professional solution for the installation of your air conditioning system. Delivery | Setup | Commissioning | Handover
Scope of Services
Working time: Total 20 hours of team effort (2 technicians)
Travel: up to 200 km (one way)
Accomodation: included
Material delivery: ordered units, components, installation sets delivered curbside
Installation: indoor and outdoor units including piping
System check: pressure test, vacuum, leak test, and functional run
Commissioning: complete documented handover in operational condition
Instruction: operation, basic functions, and maintenance guidance
Additional services to be ordered separately
Electrical connection (fuse connection, RCD/MCB, repair switch)
Additional kilometers beyond 200 km
Overnight costs for longer distances or multi-day assignments
Special work (core drilling, wall penetrations, pipe adjustments)
Condensate pump, funnel siphon, or connection to existing lines
Connection or integration with Wifi or KNX
Provision of scaffolding from 2 m working height, crane transport, lifts
Provision of special tools and equipment for dismantling
Construction and follow-up work: masonry, painting, roofing, and similar trades
This ensures a structured, efficient, and professional installation with a clearly defined scope of services. Installation is carried out according to ChemKlimaschutzV, EU 573/2024 and only by certified personnel or HVAC specialists.
NOTE: Fixed-price packages may include delivery and/or installation by service technicians using special tools and specialized vehicles, as well as customer-specific assembled and pre-picked materials and service infrastructure. Personnel, materials, and resources are reserved exclusively. Cancellation after booking is not possible (§ 312g Abs. 2 BGB / EU Consumer Rights Directive 2011/83/EU). The installation date is scheduled once after booking and is only available within the specified season. This also applies if performance cannot be carried out for reasons attributable to the customer, including lack of cooperation or unavailability at the scheduled time.
The installation package includes the deployment of a two-person service team for a full working day, as well as a single round trip from our service hub. It provides a clearly defined, professional solution for the installation of your air conditioning system. Delivery | Setup | Commissioning | Handover
Scope of Services
Working time: Total 20 hours of team effort (2 technicians)
Travel: up to 300 km (one way)
Accomodation: included
Material delivery: ordered units, components, installation sets delivered curbside
Installation: indoor and outdoor units including piping
System check: pressure test, vacuum, leak test, and functional run
Commissioning: complete documented handover in operational condition
Instruction: operation, basic functions, and maintenance guidance
Additional services to be ordered separately
Electrical connection (fuse connection, RCD/MCB, repair switch)
Additional kilometers beyond 300 km
Overnight costs for longer distances or multi-day assignments
Special work (core drilling, wall penetrations, pipe adjustments)
Condensate pump, funnel siphon, or connection to existing lines
Connection or integration with Wifi or KNX
Provision of scaffolding from 2 m working height, crane transport, lifts
Provision of special tools and equipment for dismantling
Construction and follow-up work: masonry, painting, roofing, and similar trades
This ensures a structured, efficient, and professional installation with a clearly defined scope of services. Installation is carried out according to ChemKlimaschutzV, EU 573/2024 and only by certified personnel or HVAC specialists.
NOTE: Fixed-price packages may include delivery and/or installation by service technicians using special tools and specialized vehicles, as well as customer-specific assembled and pre-picked materials and service infrastructure. Personnel, materials, and resources are reserved exclusively. Cancellation after booking is not possible (§ 312g Abs. 2 BGB / EU Consumer Rights Directive 2011/83/EU). The installation date is scheduled once after booking and is only available within the specified season. This also applies if performance cannot be carried out for reasons attributable to the customer, including lack of cooperation or unavailability at the scheduled time.
The installation package includes the deployment of a two-person service team for a full working day, as well as a single round trip from our service hub. It provides a clearly defined, professional solution for the installation of your air conditioning system. Delivery | Setup | Commissioning | Handover
Scope of Services
Working time: Total 20 hours of team effort (2 technicians)
Travel: up to 400 km (one way)
Accomodation: included
Material delivery: ordered units, components, installation sets delivered curbside
Installation: indoor and outdoor units including piping
System check: pressure test, vacuum, leak test, and functional run
Commissioning: complete documented handover in operational condition
Instruction: operation, basic functions, and maintenance guidance
Additional services to be ordered separately
Electrical connection (fuse connection, RCD/MCB, repair switch)
Additional kilometers beyond 400 km
Overnight costs for longer distances or multi-day assignments
Special work (core drilling, wall penetrations, pipe adjustments)
Condensate pump, funnel siphon, or connection to existing lines
Connection or integration with Wifi or KNX
Provision of scaffolding from 2 m working height, crane transport, lifts
Provision of special tools and equipment for dismantling
Construction and follow-up work: masonry, painting, roofing, and similar trades
This ensures a structured, efficient, and professional installation with a clearly defined scope of services. Installation is carried out according to ChemKlimaschutzV, EU 573/2024 and only by certified personnel or HVAC specialists.
NOTE: Fixed-price packages may include delivery and/or installation by service technicians using special tools and specialized vehicles, as well as customer-specific assembled and pre-picked materials and service infrastructure. Personnel, materials, and resources are reserved exclusively. Cancellation after booking is not possible (§ 312g Abs. 2 BGB / EU Consumer Rights Directive 2011/83/EU). The installation date is scheduled once after booking and is only available within the specified season. This also applies if performance cannot be carried out for reasons attributable to the customer, including lack of cooperation or unavailability at the scheduled time.
Item - Quantity:
1 Pc
|
Task - Work Location:
DK - From Ribe
The installation package includes the deployment of a two-person service team for a full working day, as well as a single round trip from our service hub. It provides a clearly defined, professional solution for the installation of your air conditioning system. Delivery | Setup | Commissioning | Handover
Scope of Services
Working time: Total 20 hours of team effort (2 technicians)
Travel: up to 600 km (one way)
Accomodation: included
Material delivery: ordered units, components, installation sets delivered curbside
Installation: indoor and outdoor units including piping
System check: pressure test, vacuum, leak test, and functional run
Commissioning: complete documented handover in operational condition
Instruction: operation, basic functions, and maintenance guidance
Additional services to be ordered separately
Electrical connection (fuse connection, RCD/MCB, repair switch)
Additional kilometers beyond 600 km
Overnight costs for longer distances or multi-day assignments
Special work (core drilling, wall penetrations, pipe adjustments)
Condensate pump, funnel siphon, or connection to existing lines
Connection or integration with Wifi or KNX
Provision of scaffolding from 2 m working height, crane transport, lifts
Provision of special tools and equipment for dismantling
Construction and follow-up work: masonry, painting, roofing, and similar trades
This ensures a structured, efficient, and professional installation with a clearly defined scope of services. Installation is carried out according to ChemKlimaschutzV, EU 573/2024 and only by certified personnel or HVAC specialists.
NOTE: Fixed-price packages may include delivery and/or installation by service technicians using special tools and specialized vehicles, as well as customer-specific assembled and pre-picked materials and service infrastructure. Personnel, materials, and resources are reserved exclusively. Cancellation after booking is not possible (§ 312g Abs. 2 BGB / EU Consumer Rights Directive 2011/83/EU). The installation date is scheduled once after booking and is only available within the specified season. This also applies if performance cannot be carried out for reasons attributable to the customer, including lack of cooperation or unavailability at the scheduled time.
Item - Connection Length:
10m
|
Item - Installation SET Variant:
For Facades 3.6 - 14.0 kW
Installation set for small and large split air conditioning systems, primarily for commercial use, consisting of the following components in the specified quantities and for a maximum nominal capacity of approx. 12 kW.
Installation Set – Basic Equipment:
DE-WU0862104001 – 4x M8 quick connectors
DE-WU04223830 – 4x M8 rubber washers
DE-WU04168 – 4x M8 housing washers
DE-WU0057850 – 4x M8x40 machine screws
DE-WU0892143 – 1x PURLOGIC® mounting foam
DE-WU0892165 – 1x white acrylic sealant – 310 ml
DE-WU08925102 – 1x neutral silicone sealant WHITE – 310 ml
DE-WU05021413 – 12x cable ties KBL 1 made of polyamide with plastic tongue
DE-HS1001 – 10 m control cable 5 x 1.5 mm
DE-WU097366090 – 10 m cable duct 60 x 90 mm, white
DE-HS760002001 – 10 m PVC-U pipe 20 mm
DE-HS760010001 – 1x PVC-U elbow 20 mm 90°
DE-HS240016001 – 1x Tangit adhesive
DE-WU0176204560 – 30x TX screws 4.5x60 mm
DE-WU590620635 – 32x wall plugs 6 mm
DE-WU0176203535 – 2x TX screws 3x35 mm
DE-S321.4016 – 10 m CU double pipe 10, 16 mm insulated
DE-S282.0541 – 2x solder fittings 10 mm
DE-S282.0543 – 2x solder fittings 16 mm
1x nitrogen soldering gas (flat rate) content, sealant
Installation Set Variant 1 – For facades from 3.5 kW cooling capacity:
DE-WU0862009062 – 2x wall brackets 630 mm
DE-WU0862005006 – 2x end caps
DE-WU0862009125 – 2x support beams 45°
DE-WU0862005326 – 2x holding clamp M10
DE-WU005791040 – 2x hex screws M10
DE-WU037110 – 2x hex lock nuts M10
DE-WU041610 – 4x body washers M10
DE-WU590681266 – 6x universal wall plugs 12 mm
DE-WU019210100 – 6x hex screws M10x100
DE-WU041610 – 6x washers M10
Installation Set Variant 2 – For floor or flat roof installation:
DE-LIN1229000 - 1x SET roof support beams 1000 mm
DE-WU071392915 – 2x construction site protective mats (strips)
NOTE: The product image is not binding and does not represent a claim to the contents of the set. This item is manufactured according to your specifications. Therefore, you have no right of withdrawal and no Coolenvi return policy applies.
Item - Connection Length:
15m
|
Item - Installation SET Variant:
For Facades 3.6 - 14.0 kW
Installation set for small and large split air conditioning units, primarily for commercial use, consisting of the following individual components in the specified quantities and for a maximum nominal capacity of approx. 12 kW.
Installation Set – Basic Equipment:
DE-WU0862104001 – 4x M8 quick couplings
DE-WU04223830 – 4x M8 rubber washers
DE-WU04168 – 4x M8 housing washers
DE-WU0057850 – 4x M8x40 machine screws
DE-WU0892143 – 1x PURLOGIC® mounting foam
DE-WU0892165 – 1x acrylic sealant white – 310 ml
DE-WU0892165 – 1x acrylic sealant white – 310 ml
DE-WU08925102 – 1x neutral silicone sealant WHITE – 310 ml
DE-WU05021413 – 12x cable ties KBL 1 polyamide with plastic tongue
DE-HS1001 – 15 m control cable 5 x 1.5 mm²
DE-WU097366090 – 15 m cable trunking 60 x 90 mm, white
DE-HS760002001 – 15 m PVC-U pipe 20 mm
DE-HS760010001 – 1x PVC-U elbow 20 mm 90°
DE-HS240016001 – 1x Tangit adhesive
DE-WU0176204560 – 40x TX screws 4.5x60mm
DE-WU590620635 – 42x wall plugs 6mm
DE-WU0176203535 – 2x TX screws 3x35mm
DE-S321.4016 – 15 m CU double pipe 10,16mm insulated
DE-S282.0541 – 2x solder fittings 10mm
DE-S282.0543 – 2x solder fittings 16mm
1x nitrogen soldering gas (flat rate), sealant included
Installation Set Variant 1 – For facades from 3.5 kW cooling capacity:
DE-WU0862009062 – 2x wall brackets 630mm
DE-WU0862005006 – 2x end caps
DE-WU0862009125 – 2x support bars 45°
DE-WU0862005326 – 2x retaining clips M10
DE-WU005791040 – 2x hex screws M10
DE-WU037110 – 2x hex lock nuts M10
DE-WU041610 – 4x fender washers M10
DE-WU590681266 – 6x universal wall plugs 12 mm
DE-WU019210100 – 6x hex screws M10x100
DE-WU041610 – 6x washers M10
Installation Set Variant 2 – For floor or flat roof mounting:
DE-LIN1229000 - 1x SET roof support beams 1000mm
DE-WU071392915 – 2x construction protection mats (strips)
NOTE: The product image is not binding and does not represent a claim to the contents of the set. This item is manufactured according to your specifications. Therefore, you have no right of withdrawal and no Coolenvi return policy applies.
Item - Connection Length:
20m
|
Item - Installation SET Variant:
For Facades 3.6 - 14.0 kW
Installation set for small and large split air conditioning units, primarily for commercial use, consisting of the following individual components in the specified quantities and for a maximum nominal capacity of approx. 12 kW.
Installation Set – Basic Equipment:
DE-WU0862104001 – 4x M8 quick couplings
DE-WU04223830 – 4x M8 rubber washers
DE-WU04168 – 4x M8 housing washers
DE-WU0057850 – 4x M8x40 machine screws
DE-WU0892143 – 1x PURLOGIC® mounting foam
DE-WU0892165 – 1x acrylic sealant white – 310 ml
DE-WU0892165 – 1x acrylic sealant white – 310 ml
DE-WU08925102 – 1x neutral silicone sealant WHITE – 310 ml
DE-WU05021413 – 20x cable ties KBL 1 polyamide with plastic tongue
DE-HS1001 – 20 m control cable 5 x 1.5 mm²
DE-WU097366090 – 20 m cable trunking 60 x 90 mm, white
DE-HS760002001 – 20 m PVC-U pipe 20 mm
DE-HS760010001 – 1x PVC-U elbow 20 mm 90°
DE-HS240016001 – 1x Tangit adhesive
DE-WU0176204560 – 50x TX screws 4.5x60mm
DE-WU590620635 – 52x wall plugs 6mm
DE-WU0176203535 – 2x TX screws 3x35mm
DE-S321.4016 – 20 m CU double pipe 10,16mm insulated
DE-S282.0541 – 2x solder fittings 10mm
DE-S282.0543 – 2x solder fittings 16mm
1x nitrogen soldering gas (flat rate), sealant included
Installation Set Variant 1 – For facades from 3.5 kW cooling capacity:
DE-WU0862009062 – 2x wall brackets 630mm
DE-WU0862005006 – 2x end caps
DE-WU0862009125 – 2x support bars 45°
DE-WU0862005326 – 2x retaining clips M10
DE-WU005791040 – 2x hex screws M10
DE-WU037110 – 2x hex lock nuts M10
DE-WU041610 – 4x fender washers M10
DE-WU590681266 – 6x universal wall plugs 12 mm
DE-WU019210100 – 6x hex screws M10x100
DE-WU041610 – 6x washers M10
Installation Set Variant 2 – For floor or flat roof mounting:
DE-LIN1229000 - 1x SET roof support beams 1000mm
DE-WU071392915 – 2x construction protection mats (strips)
NOTE: The product image is not binding and does not represent a claim to the contents of the set. This item is manufactured according to your specifications. Therefore, you have no right of withdrawal and no Coolenvi return policy applies.
Item - Connection Length:
3m
|
Item - Installation SET Variant:
For Facades 3.6 - 14.0 kW
Installation kit for small and large split air conditioning systems, primarily for commercial applications, consisting of the following individual components in the corresponding quantities and for a maximum rated air conditioning output of approximately 12 kW.
Installation set – basic equipment:
DE-WU0862104001 – 4x M8 quick-release fasteners
DE-WU04223830 – 4x M8 rubber washers
DE-WU04168 – 4x M8 housing washers
DE-WU0057850 – 4x M8x40 machine screws
DE-WU0892143 – 1x PURLOGIC® Easy-Mounting foam
DE-WU0892165 – 1x acrylic sealant white – 310 ml
DE-WU0892165 – 1x acrylic sealant white – 310 ml
DE-WU08925102 – 1x neutral silicone sealant WHITE – 310 ml
DE-WU05021413 – 6x cable ties KBL 1 made of polyamide with plastic tongue
DE-HS1001 – 3 m control cable 5 x 1.5 mm
DE-WU097366090 – 3 m cable duct 60 x 90 mm, white
DE-HS760002001 – 3 m PVC-U pipe 20 mm
DE-HS760010001 – 1x PVC-U angle 20 mm, 90°
DE-HS240016001 – 1x Tangit glue
DE-WU0176204560 – 20x TX screws 4.5x60mm
DE-WU590620635 - 20x dowels 6mm
DE-WU0176203535 - 2x TX screws 3x35mm
DE-S321.4016 - 3m CU double pipe 10, 16mm insulated
DE-S282.0541 - 2x solder sockets 10 mm
DE-S282.0543 – 2x solder sockets 16 mm
1x nitrogen flat rate, soldering gas, sealant
Mounting kit variant 1 – For facades with a cooling capacity over 3.5 kW:
DE-WU0862009062 – 2x wall brackets 630 mm
DE-WU0862005006 – 2x end caps
DE-WU0862009125 – 2x bracket 45°
DE-WU0862005326 – 2x retaining clips clamp
DE-WU005791040 – 2x hexagon screw M10
DE-WU037110 – 2x hexagon nut M10
DE-WU590681266 – 6x Universal wall anchor 12 mm
DE-WU019210100 – 6x Hex bolts M10x100
DE-WU041610 – 6x Washers M10
Mounting kit variant 2 – For floor or flat roof mounting:
DE-LIN1229000 - 1x SET roof support beam 1000 mm
DE-WU071392915 – 2x Construction site protection mats in strips
NOTE: The product image is not binding and does not represent a claim to the contents of the set. This item is manufactured according to your specifications. Therefore, you have no right of withdrawal and no Coolenvi return policy applies.
Item - Connection Length:
5m
|
Item - Installation SET Variant:
For Facades 3.6 - 14.0 kW
Installation set for small and large split air conditioning systems, primarily for residential use, consisting of the following individual components in the specified quantities and for a maximum nominal capacity of approx. 12 kW.
Installation Set – Basic Equipment:
DE-WU0862104001 – 4x M8 quick connectors
DE-WU04223830 – 4x M8 rubber washers
DE-WU04168 – 4x M8 housing washers
DE-WU0057850 – 4x M8x40 machine screws
DE-WU0892143 – 1x PURLOGIC® mounting foam
DE-WU0892165 – 1x white acrylic sealant – 310 ml
DE-WU08925102 – 1x neutral silicone sealant WHITE – 310 ml
DE-WU05021413 – 6x cable ties KBL 1 made of polyamide with plastic tongue
DE-HS1001 – 5 m control cable 5 x 1.5 mm
DE-WU097366090 – 5 m cable duct 60 x 90 mm, white
DE-HS760002001 – 5 m PVC-U pipe 20 mm
DE-HS760010001 – 1x PVC-U elbow 20 mm 90°
DE-HS240016001 – 1x Tangit adhesive
DE-WU0176204560 – 30x TX screws 4.5x60 mm
DE-WU590620635 – 32x wall plugs 6 mm
DE-WU0176203535 – 2x TX screws 3x35 mm
DE-S321.4046 – 5 m CU double pipe 6, 12 mm insulated
DE-S282.0540 – 2x solder sleeves 6 mm
DE-S282.0542 – 2x solder sleeves 12 mm
1x nitrogen soldering gas (flat rate) content, sealant
Installation Set Variant 1 – For facades from 3.5 kW cooling capacity:
DE-WU0862009062 - 2x wall bracket 630 mm
DE-WU0862005006 – 2x end caps
DE-WU0862009125 - 2x support beams 45°
DE-WU0862005326 - 2x holding clamp M10
DE-WU005791040 - 2x hex screw M10
DE-WU037110 - 2x hex lock nut M10
DE-WU041610 - 6x body washers M10
DE-WU590681266 – 6x universal wall plugs 12 mm
DE-WU019210100 – 6x hex screws M10x100
DE-WU041610 – 6x washers M10
Installation Set Variant 2 – For floor or flat roof installation:
DE-LIN1229000 - 1x SET roof support beams 1000 mm
DE-WU071392915 – 2x construction site protective mats (strips)
NOTE: The product image is not binding and does not represent a claim to the contents of the set. This item is manufactured according to your specifications. Therefore, you have no right of withdrawal and no Coolenvi return policy applies.
Installation set for anchoring of usual two-point consoles with supporting trusses, primarily for installing appliances in commercial use on insulated facades with External Thermal Insulation Composite System. This SET is consisting of the following individual components in the specified quantities and for a maximum nominal capacity of approximately 12 kW and thickness of insulation of upt o 200mm max.
Installation Set – For ETICS thickness from 100 - 200 mm:
DE-WU0892165 – 1x acrylic sealant white – 310 ml
DE-WU0903450205 – 3x Allround Injection Mortar WIT-VM 250 – 420 ml
DE-WU090344121 - 6x 12x50mm Sieve sleeve anchor - Perforated brickwork, aerated concrete
DE-WU0905461016 - 6x M10x260mm Anchor rod for injection system
DE-WU041610 – 12x M10x30mm fender washer
DE-WU031710 – 12x hex nuts M10
DE-WU0911100200 - 6x Distance Spacer Installation AMO MAX